* During the accelerator full maintenance day (TODAY)                                                                                                                                     
 
* During the accelerator full maintenance day (TODAY)                                                                                                                                     
 
**S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period [https://logbooks.jlab.org/entry/4003796 HMS Dipole LCW]  (<span style="color:red"> '''PENDING''' </span>) NOTE: Actually, Heidi and Jack will will need to access Hall C to work on HMS dipole, to get dimensions before ordering the parts needed to install the crush washers.                                                                                                                                                 
 
**S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period [https://logbooks.jlab.org/entry/4003796 HMS Dipole LCW]  (<span style="color:red"> '''PENDING''' </span>) NOTE: Actually, Heidi and Jack will will need to access Hall C to work on HMS dipole, to get dimensions before ordering the parts needed to install the crush washers.                                                                                                                                                 
** Hall C drift-chamber expert will need to go to the HMS Hut to try and fix the HMS DC noise issues. Maybe better grounding is required? Or discriminator cards may need to be re-seated? (<span style="color:red"> '''PENDING''' </span>) See HMS DC Card Map: https://hallcweb.jlab.org/wiki/images/1/11/HMS_DriftChamberPlanesLayout.pdf and log-entry: https://logbooks.jlab.org/entry/4005562 describing which wire groups are noisy                                                                                                                                                                                
+
** Hall C drift-chamber expert will need to go to the HMS Hut to try and fix the HMS DC noise issues. Maybe better grounding is required? Or discriminator cards may need to be re-seated? (<span style="color:red"> '''PENDING''' </span>) See HMS DC Card Map: https://hallcweb.jlab.org/wiki/images/1/11/HMS_DriftChamberPlanesLayout.pdf and log-entry: https://logbooks.jlab.org/entry/4005562 describing which wire groups are noisy.                                                                                                                                                                                   
 
**Xinzhan Bai and Jixie Zhang request to change gas bottle for solid Cherenkov detector: Contact: xbai@jlab.org,  cell: (434) 422-2809  (<span style="color:red"> '''PENDING''' </span>)
 
**Xinzhan Bai and Jixie Zhang request to change gas bottle for solid Cherenkov detector: Contact: xbai@jlab.org,  cell: (434) 422-2809  (<span style="color:red"> '''PENDING''' </span>)
  

Revision as of 09:06, 23 June 2022

Current Status

  • Accelerator status:
    • Beam went away at 6:15 am for planned maintenance day and power shed
    • Restoration should occur late DAY or Early SWING
    • Will try to push to 80 uA (current 45 uA is highest stable available current)
  • Experiment status:
    • pionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency after full maintenance tomorrow.
    • Q1 Interlock at 4:30 am. No production data since. Will address DAY shift. This was RESOLVED
    • SHMS Dipole is not ramping to set current. Heidi and Steve L. have been notified
    • On page 33 of run plan. New Setting: Q2=2.45, W=3.20, x=0.21, high ε data taking. Angles are set, awaiting SHMS Dipole troubleshooting

Current Run Plan

pionLT Summer 2022 Run Plan
Physics Status

Notices in Effect for Shift Crew

  • Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU
  • Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting
  • When analyzing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analyzing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.

Current Issues

Planned Accesses to the Hall

  • During the accelerator full maintenance day (TODAY)
    • S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period HMS Dipole LCW ( PENDING ) NOTE: Actually, Heidi and Jack will will need to access Hall C to work on HMS dipole, to get dimensions before ordering the parts needed to install the crush washers.
    • Hall C drift-chamber expert will need to go to the HMS Hut to try and fix the HMS DC noise issues. Maybe better grounding is required? Or discriminator cards may need to be re-seated? ( PENDING ) See HMS DC Card Map: https://hallcweb.jlab.org/wiki/images/1/11/HMS_DriftChamberPlanesLayout.pdf and log-entry: https://logbooks.jlab.org/entry/4005562 describing which wire groups are noisy.
    • Xinzhan Bai and Jixie Zhang request to change gas bottle for solid Cherenkov detector: Contact: xbai@jlab.org, cell: (434) 422-2809 ( PENDING )

Planned Accelerator Configuration Changes

  • Full accelerator maintenance day today. Beam was be taken away at 6:15 am. Best case scenario is beam restoration will begin at 15:00

Special Requests

  • Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. ( DONE )