** Hall C target chamber and downstream dump-line vacuum readings are 3e-5 torr and 200 torr, respectively. | ** Hall C target chamber and downstream dump-line vacuum readings are 3e-5 torr and 200 torr, respectively. | ||
** Meekins does have some recommendations for that system, but will not make any changes without talking to Walter Kellner first | ** Meekins does have some recommendations for that system, but will not make any changes without talking to Walter Kellner first | ||
+ | *[https://logbooks.jlab.org/entry/4041785] | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = |
Revision as of 08:30, 15 September 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
- Shift Signup (Read only)
- PionLT_2022_Physics_Status
- KaonLT Logbook - Used for PionLT updates too
- Physics analysis updates should be cross posted here
- Run Plans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- D. Meekins target work completed and cool down of LH2/LD2 will be done today late in the morning
(there are issues with beam-line vacuum that will need to get resolved before locking Hall C for beam)
- After work is done, S. Lassiter will need to do rotation certification before spectrometers can be rotated (before Friday afternoon)
- J. Beaufait will do Hall C walkthrough Friday @ 2:00 pm, afterwards, Hall C will be swept and go to beam permit.
Current Run Plan
Notices in Effect for Shift Crew
Current Issues
- beam-line vacuum issues (too low):
- Hall C target chamber and downstream dump-line vacuum readings are 3e-5 torr and 200 torr, respectively.