Difference between revisions of "Sep 17, 2022"

From HallCWiki
Jump to navigationJump to search
(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...")
 
Line 20: Line 20:
  
 
= Useful Links =
 
= Useful Links =
 
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT-2022 Shift Signup ('''Read only''')]
 
** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT-2022 Shift Signup]
 
* [[PionLT_2022_Physics_Status]]
 
* [https://logbooks.jlab.org/book/kaonlt KaonLT Logbook] - Used for PionLT updates too
 
** Physics analysis updates ''should'' be cross posted here
 
* [https://redmine.jlab.org/projects/hall-c/wiki/2022_Run_Plans_and_Run_Sheets Run Plans]
 
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
Line 32: Line 25:
  
 
= Current Status =
 
= Current Status =
* Sep 16 Swing
+
* Harp Scans completed (Sep 16 Swing) IHA3H07A --> https://logbooks.jlab.org/entry/4042622 | IHA3H07B --> https://logbooks.jlab.org/entry/4042625
** MCC sends beam and does harp scan. IHA3H07A --> https://logbooks.jlab.org/entry/4042622 | IHA3H07B --> https://logbooks.jlab.org/entry/4042625
+
* Downstream beamline valve was shutoff -->  https://logbooks.jlab.org/entry/4042671  The issue was resolved by Hall C techs today at 7AM
** Downstream beamline valve was shutoff -->  https://logbooks.jlab.org/entry/4042671  The issue was resolved by Hall C techs today at 7AM
+
* Currently receiving tune beam
 
 
  
 
= Current Run Plan =
 
= Current Run Plan =
Line 45: Line 37:
  
 
= Current Issues =
 
= Current Issues =
* Target is unbale to move to "Hole" position, encoder position has to be put in by hand. D. Meekins / C. Keith currently working on diagnosis.
+
* Target is unbale to move to "Hole" position, encoder position has to be put in by hand. D. Meekins / C. Keith currently working on diagnosis. All other targets were tested, and motion was verified.  
All other targets were tested, and motion was verified.  
+
* During shift checklist, Holly noticed some minor issues --> https://logbooks.jlab.org/entry/4042694
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =

Revision as of 08:34, 17 September 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

Current Run Plan

Notices in Effect for Shift Crew

Current Issues

  • Target is unbale to move to "Hole" position, encoder position has to be put in by hand. D. Meekins / C. Keith currently working on diagnosis. All other targets were tested, and motion was verified.
  • During shift checklist, Holly noticed some minor issues --> https://logbooks.jlab.org/entry/4042694

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests