Difference between revisions of "December 7, 2022"
From HallCWiki
Jump to navigationJump to search (Created page with "= RC Meeting Information = * [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_fall_2022 Return to RC meeting main page] <b> RC Daily Meetings are at 11:00 (am) via...") |
|||
Line 32: | Line 32: | ||
* HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300 | * HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300 | ||
* Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562 | * Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562 | ||
+ | * Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV) | ||
+ | ** Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am. | ||
+ | |||
+ | = Run Plan = | ||
+ | * Move Setting 3.3.5 | ||
+ | * Target Boiling---- Priority | ||
+ | * BCM Calibration? | ||
+ | * Energy Measurement? |
Revision as of 10:28, 7 December 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Currently in Controlled Access during the RF recovery
- HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300
- Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562
- Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV)
- Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am.
Run Plan
- Move Setting 3.3.5
- Target Boiling---- Priority
- BCM Calibration?
- Energy Measurement?