Difference between revisions of "December 16, 2022"
From HallCWiki
Jump to navigationJump to searchLine 33: | Line 33: | ||
** [https://logbooks.jlab.org/entry/4102213 Swing (12/15)] | ** [https://logbooks.jlab.org/entry/4102213 Swing (12/15)] | ||
** [https://logbooks.jlab.org/entry/4102308 Owl (12/16)] | ** [https://logbooks.jlab.org/entry/4102308 Owl (12/16)] | ||
− | * Currently in the second cycle of | + | * Currently in the second cycle of Setting 1 of HMS high x at 35 degrees. |
* Yesterday | * Yesterday | ||
** BCM calibrations did not work, as the unser was saturated. | ** BCM calibrations did not work, as the unser was saturated. | ||
*** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it]. | *** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it]. | ||
*** Should be good to go for another BCM calibration, although 60 uA may still saturate. | *** Should be good to go for another BCM calibration, although 60 uA may still saturate. | ||
+ | ** [https://logbooks.jlab.org/entry/4102214 PSS Failure: Hall C suddenly dropped to Restricted Access around 4pm] | ||
+ | *** Hall Swept and Run-Save Boxes armed. Back to Beam permit around 5:30 PM] | ||
+ | ** Unable to send stable 40uA beam until about 7:30 pm due to thunderstorms. | ||
+ | ** Smooth data collection afterwards and through the night, although [https://logbooks.jlab.org/entry/4102326 HMS CODA needed to be restarted once]. | ||
+ | |||
= Current Run Plan = | = Current Run Plan = | ||
− | * | + | * BCM Calibration planned for 9:30 AM Dec 16 (this morning) |
+ | * Continue with run plan printed sheet. High x HMS at 35 degrees. | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
− | * | + | * Continue to fill out SHMS excel sheet for good electrons . |
+ | * Keep SHMS prescaled rate below 8kHz. | ||
= Current Issues = | = Current Issues = | ||
− | * | + | * HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field. May make chaining to the new HMS momentum difficult. |
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = |
Revision as of 08:58, 16 December 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Shift Summaries
- Currently in the second cycle of Setting 1 of HMS high x at 35 degrees.
- Yesterday
- BCM calibrations did not work, as the unser was saturated.
- Dave Mack came in and power cycled it.
- Should be good to go for another BCM calibration, although 60 uA may still saturate.
- PSS Failure: Hall C suddenly dropped to Restricted Access around 4pm
- Hall Swept and Run-Save Boxes armed. Back to Beam permit around 5:30 PM]
- Unable to send stable 40uA beam until about 7:30 pm due to thunderstorms.
- Smooth data collection afterwards and through the night, although HMS CODA needed to be restarted once.
- BCM calibrations did not work, as the unser was saturated.
Current Run Plan
- BCM Calibration planned for 9:30 AM Dec 16 (this morning)
- Continue with run plan printed sheet. High x HMS at 35 degrees.
Notices in Effect for Shift Crew
- Continue to fill out SHMS excel sheet for good electrons .
- Keep SHMS prescaled rate below 8kHz.
Current Issues
- HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field. May make chaining to the new HMS momentum difficult.