= Current Status =
 
= Current Status =
* [https://logbooks.jlab.org/entry/4102994] Hall C is currently down due to another PSS error that suddenly put Hall C in restricted access
+
* [https://logbooks.jlab.org/entry/4102994 Hall C is currently down due to another PSS error] [https://logbooks.jlab.org/entry/4102973 that suddenly put Hall C in restricted access.]
 
** Expert on-call unable to solve issue.  
 
** Expert on-call unable to solve issue.  
 
** Experts due to come in at 8:00 AM  
 
** Experts due to come in at 8:00 AM  

Revision as of 11:02, 18 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Today
    • When beam comes back, continue with the run plan on Setting 2.
  • Yesterday
    • Changed to Setting 2 of HMS high x at 35 degrees at the start of swing shift.
    • Smooth running until 1L21 cavity dropping at 00:20, followed by PSS error
    • HCDESK 4 got bumped and logged out when we were messing with cables to get the TV screens back
      • Logged back to redhat as cdaq user and restored vnc and scripts with no problem.

Current Run Plan

  • Continue with Setting 2.
    • Are there any changes that need to happen to the run plan due to beam being down all night?

Notices in Effect for Shift Crew

  • Continue to fill out SHMS Excel Spreadsheet.

Current Issues

  • Hall C in restricted access due to PSS Error.
  • MCC investigating as to why the Energy Measurement failed so badly.
    • Email from Jay Benesch: "Beam should be about 2 mm sigma in the horizontal due to peak

dispersion. Beam line 22 mm ID, centroid horizontal offset only 1 mm so ten sigma should have sufficed."

    • Mentioned in meeting that they have changed the procedure to have 2uA tune beam when during certain parts of the measurement when possible (instead of 10uA).
      • (Said quite a few things that I didn't understand about some technical things).
    • We should continue to follow up with them to get the mystery solved before the next beam energy measurement.
  • What do we need to do for Monday?
    • Warm up target.
    • Power Down the magnets
    • Turn off HVs
      • Leave any on?

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests