(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...")
 
(Issues/updates)
Line 38: Line 38:
 
= Issues/updates =
 
= Issues/updates =
 
* We did not have major issues in the Hall in the last 24 hours.
 
* We did not have major issues in the Hall in the last 24 hours.
* Solid parasitic tests accessed the hall yesterday in the down time to fix some of their equipment.
+
* Solid parasitic tests accessed the hall yesterday in the down time to fix some of their equipment https://logbooks.jlab.org/entry/4131180
  
 
= Current Issues =
 
= Current Issues =

Revision as of 10:22, 15 February 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • We are running with 3He in setting 2 (first cycle), page 160 of the runplan. We have completed 65K/72/K good electrons according to the online analysis.
  • We ran with 40 uA until 3 am this morning and then we were lowered to 30 uA ever since. Probably, we will continue running with this current unless the beam trips increase and we have to be lower again.

Current Run Plan

Issues/updates

  • We did not have major issues in the Hall in the last 24 hours.
  • Solid parasitic tests accessed the hall yesterday in the down time to fix some of their equipment https://logbooks.jlab.org/entry/4131180

Current Issues

  • N/A

Planned Accesses to the Hall

  • Monday 8 am(?) through Tuesday ~ 2pm for target change
    • RadCon and PD already have been informed by Nathaly
  • parasitically to target change, work on Solid prototype test
  • parasitically to target change, bring new HMS transfer line into hall (requires opening truck ramp)

Planned Accelerator

  • Beam to four halls with no schedule test/studies/recovery... time.

Special Requests/Tasks

  • Monday, establish coincidence trigger
  • Do we need to change any limits for spectrometer rotation??