Difference between revisions of "BPM calibration information"

From HallCWiki
Jump to navigationJump to search
Line 2: Line 2:
  
 
{|border="1" align="center"
 
{|border="1" align="center"
! Date  !!  Method !! AXoff !! BXoff  !! CXoff !! AYoff !! BYoff !! CYoff !! AXslope !! BXslope !! CXslope !! AYslope !! BYslope !! CYslope
+
! Date  !!  Method !! AXoff !! BXoff  !! CXoff !! AYoff !! BYoff !! CYoff !! AXslope !! BXslope !! CXslope !! AYslope !! BYslope !! CYslope !! Notes
 
|-
 
|-
! 1/13/2018  !! Calibration !! -0.06 !! 0.07  !! -1.06 !! -0.46 !! 0.12 !! 0.61 !! -0.98 !! -1.12 !! -0.96 !! 0.97 !! 1.17 !! 0.87  
+
! 1/13/2018  !! Calibration !! -0.06 !! 0.07  !! -1.06 !! -0.46 !! 0.12 !! 0.61 !! -0.98 !! -1.12 !! -0.96 !! 0.97 !! 1.17 !! 0.87 !! 1st calibration
 
|-
 
|-
! 8/29/2018  !! Harp scan !! 0.15 !! 0.29  !! -1.08 !! -0.12 !! 0.63 !! 1.09 !! - !!  - !! - !! - !! - !! -
+
! 8/29/2018  !! Harp scan !! 0.15 !! 0.29  !! -1.08 !! -0.12 !! 0.63 !! 1.09 !! - !!  - !! - !! - !! - !! - !! -  
 
|-  
 
|-  
! 2/9/2019  !! Harp scan !! 0.25 !! 0.46  !! -1.01 !! -0.08 !! -0.04 !! -0.11 !! - !!  - !! - !! - !! - !! -
+
! 2/9/2019  !! Harp scan !! 0.25 !! 0.46  !! -1.01 !! -0.08 !! -0.04 !! -0.11 !! - !!  - !! - !! - !! - !! - !! Radiator installed during January 2019 SAD
 
|-  
 
|-  
! 6/23/2019  !! Calibration !! 0.11 !! 0.17  !! -1.07 !! -0.40 !! -0.18 !! -0.40 !! -0.97 !! -1.11 !! -0.95 !! 0.95 !! 1.15 !! 0.85
+
! 6/23/2019  !! Calibration !! 0.11 !! 0.17  !! -1.07 !! -0.40 !! -0.18 !! -0.40 !! -0.97 !! -1.11 !! -0.95 !! 0.95 !! 1.15 !! 0.85 !! -
 
|-  
 
|-  
! 12/8/2019  !! Calibration !! 0.14 !! 0.22  !! -1.13 !! -0.06 !! -0.29 !! -0.78 !! -0.96 !! -1.09 !! -0.96 !! 0.95 !! 1.16 !! 0.85
+
! 12/8/2019  !! Calibration !! 0.14 !! 0.22  !! -1.13 !! -0.06 !! -0.29 !! -0.78 !! -0.96 !! -1.09 !! -0.96 !! 0.95 !! 1.16 !! 0.85 !! Polarized 3He expt
 
|-  
 
|-  
 
|}
 
|}

Revision as of 14:27, 5 May 2023

  • The beam position monitors (BPMs) on the diagnostic girder in Hall C (IPM3H07A, IPM3H07B, and IPM3H07C) are calibrated by comparison with the Hall C superharps (IHA3H07A and IHA3H07B). Ideally, a "bulls-eye" scan is doe which allows one to determine the BPMS offsets and slopes. However, a single harp scan is sufficient to check the BPM offsets.
Date Method AXoff BXoff CXoff AYoff BYoff CYoff AXslope BXslope CXslope AYslope BYslope CYslope Notes
1/13/2018 Calibration -0.06 0.07 -1.06 -0.46 0.12 0.61 -0.98 -1.12 -0.96 0.97 1.17 0.87 1st calibration
8/29/2018 Harp scan 0.15 0.29 -1.08 -0.12 0.63 1.09 - - - - - - -
2/9/2019 Harp scan 0.25 0.46 -1.01 -0.08 -0.04 -0.11 - - - - - - Radiator installed during January 2019 SAD
6/23/2019 Calibration 0.11 0.17 -1.07 -0.40 -0.18 -0.40 -0.97 -1.11 -0.95 0.95 1.15 0.85 -
12/8/2019 Calibration 0.14 0.22 -1.13 -0.06 -0.29 -0.78 -0.96 -1.09 -0.96 0.95 1.16 0.85 Polarized 3He expt