Difference between revisions of "September 19, 2023"
From HallCWiki
Jump to navigationJump to searchLine 7: | Line 7: | ||
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup ('''Read only''')] | * [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup ('''Read only''')] | ||
− | ** https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup] | + | ** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup] |
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] |
Latest revision as of 08:52, 19 September 2023
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information: https://logbooks.jlab.org/entry/4171589
Useful Links
Current Status
- Finished 3, 1-hour runs at 5 pass elastic settings
- Attempted arc energy measurement, BCM calibration yesterday: not completed
- Restarted HMS high momentum optics
- HMS high momentum optics data taking underway
Current Run Plan
- Short term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- HMS high momentum optics at P_HMS=-6.117 GeV and -5.639 GeV
- Arc energy measurement this morning
- Moller measurement Thursday? Hall A is planning one also
- BCM calibration Thursday or Friday?
Notices in Effect for Shift Crew
Current Issues
- MQF3M01 (small Moller quad) remote control not working
- 3 channels missing in calorimeter
Planned Accesses to the Hall
- Controlled Access tomorrow (Wednesday) during day shift
- Repair MQF3M01 power supply/polarity switch (DC power)
- Check NDX detector location
- Repair three missing channels in calorimeter, replace more cables (?)