Difference between revisions of "September 28, 2023"
Line 5: | Line 5: | ||
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
− | + | Zoom remote connection information: | |
− | + | Join ZoomGov Meeting | |
− | + | https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX | |
− | + | Meeting ID: 161 701 5555 | |
− | + | Passcode: 288953 | |
= Useful Links = | = Useful Links = |
Revision as of 08:03, 28 September 2023
RC Meeting Information
Current RC: Iuliia Skorodumina
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
Zoom remote connection information: Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX Meeting ID: 161 701 5555 Passcode: 288953
Useful Links
Current Run Plan
The was no beam Wednesday Swing and Thursday Owl as the accelerator is still struggling with the BSY issues (https://logbooks.jlab.org/entry/4188723). We still need to finish the last elastic setting and then should go to production data taking. Before going to production, we need to move the NPS closer to the target, which requires an access and several hours of work. We planned to move the calorimeter today, but since the last elastic setting is still not completed and the accelerator seems to expect beam later today, it was decided to postpone the work until Friday Day shift.
The current run plan is to wait for the beam and to complete the last elastic setting until Friday morning.
There will be the RC meeting today at 11 a.m.
Planned Accesses to the Hall
On Friday Day shift we plan to move the NPS closer to the target, which will require several hours of work in the hall.