Difference between revisions of "October 26, 2023"
Line 1: | Line 1: | ||
− | = RC Meeting Information = | + | = RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit |
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
Line 27: | Line 27: | ||
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
+ | |||
+ | = Past 24 hours = | ||
+ | |||
+ | Items addressed from our side inside of the Hall: | ||
+ | 1. Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked? | ||
+ | 2. Jerry and others worked on the pump on top of the HMS | ||
+ | 3. Ellen went into the hall to check various cryocomponents. | ||
+ | 4. AC work in the CH completed | ||
+ | |||
+ | Items addressed from our side of the Hall: | ||
+ | 1. Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current. | ||
+ | 2. Bob worked on the scaler. | ||
+ | 3. Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.) | ||
+ | 4. Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes". | ||
+ | |||
= Current Status = | = Current Status = |
Revision as of 09:50, 26 October 2023
= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Past 24 hours
Items addressed from our side inside of the Hall: 1. Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked? 2. Jerry and others worked on the pump on top of the HMS 3. Ellen went into the hall to check various cryocomponents. 4. AC work in the CH completed
Items addressed from our side of the Hall: 1. Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current. 2. Bob worked on the scaler. 3. Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.) 4. Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes".
Current Status
- Continue production
- RC summary: https://logbooks.jlab.org/entry/4209118
Current Run Plan
- Half wave plane change at 11 a.m.
- Moller measurement starting 8:30 a.m., last Friday for the day shift.
Current Issues
- Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099
- NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048
- Lost communication with the raster IOC: https://logbooks.jlab.org/entry/4208767
- Alarm handler no warning? https://logbooks.jlab.org/entry/4209113
- Sieve got stuck: https://logbooks.jlab.org/entry/4209150
Planned Accesses to the Hall Today
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 31th