Difference between revisions of "November 30, 2023"
From HallCWiki
Jump to navigationJump to searchLine 43: | Line 43: | ||
* Everything on hallgw not working in the counting house https://logbooks.jlab.org/entry/4229248 | * Everything on hallgw not working in the counting house https://logbooks.jlab.org/entry/4229248 | ||
* LV problem in Cal and FADC swap needed. Ben Raydo is notified and will come when we are ready for the access https://logbooks.jlab.org/entry/4229163 | * LV problem in Cal and FADC swap needed. Ben Raydo is notified and will come when we are ready for the access https://logbooks.jlab.org/entry/4229163 | ||
+ | * Serious degradation of the photocathode probably contributed to the low polarization Hall B measured. Plans are being discussed about how to proceed with the gun in its current state. | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = |
Revision as of 08:54, 30 November 2023
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Waiting for a sweep so we can go to controlled access
Current Run Plan
- Configuration change to kinematic x60_2 when the network issues are resolved. Continue to run plan.
- Completed energy measurement at the start of owl last night https://logbooks.jlab.org/entry/4229124
- BCM calibration completed at the end of swing shift last night up to 40uA https://logbooks.jlab.org/entry/4229041
- HMS dipole wouldn't turn on last night (initially) so we made an access. Joe found that the multi-phase switch was broken and was able to jumper around the switch https://logbooks.jlab.org/entry/4228976
Notices in Effect for Shift Crew
- Ln2 levels are fluctuating since yesterday. Not a problem, it just takes time to stabilize. Heidi is monitoring: https://logbooks.jlab.org/entry/4229205
Current Issues
- Everything on hallgw not working in the counting house https://logbooks.jlab.org/entry/4229248
- LV problem in Cal and FADC swap needed. Ben Raydo is notified and will come when we are ready for the access https://logbooks.jlab.org/entry/4229163
- Serious degradation of the photocathode probably contributed to the low polarization Hall B measured. Plans are being discussed about how to proceed with the gun in its current state.
Planned Accesses to the Hall
- Will access the Hall this morning to fix the LV problem and swap an FADC.
Planned Accelerator Configuration Changes
- None