Difference between revisions of "December 2, 2023"

From HallCWiki
Jump to navigationJump to search
 
Line 14: Line 14:
  
 
= Current Status =
 
= Current Status =
 +
* Calorimeter was moved back in place 9am, then removed NPS sweeper locks
 
* Moller is ready to take measurement whenever we are https://logbooks.jlab.org/entry/4229528
 
* Moller is ready to take measurement whenever we are https://logbooks.jlab.org/entry/4229528
 
* Ellen fixed the dipole PLC! https://logbooks.jlab.org/entry/4229581
 
* Ellen fixed the dipole PLC! https://logbooks.jlab.org/entry/4229581
Line 20: Line 21:
  
 
= Current Run Plan =  
 
= Current Run Plan =  
* Hall will be swept to go to power permit after that
+
* Hall being swept now for power permit  
* Setup beam, start run plan
+
* No beam today :-( Best case scenario around noon tomorrow
 +
* Day, Swing, and Owl SL not needed
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =

Latest revision as of 10:23, 2 December 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Current Status

Current Run Plan

  • Hall being swept now for power permit
  • No beam today :-( Best case scenario around noon tomorrow
  • Day, Swing, and Owl SL not needed

Notices in Effect for Shift Crew

Current Issues

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests