Difference between revisions of "March 13, 2024"

From HallCWiki
Jump to navigationJump to search
Line 29: Line 29:
 
Hall C is in Controlled access. We plan the following work in the Hall:
 
Hall C is in Controlled access. We plan the following work in the Hall:
  
* NPS crew (4/5 students. Tasks include checking some noisy channels, replacing temperature sensors electronics, possibly replacing a few bases. Work needs to be completed by 3:30pm when the techs will return to move the calorimeter back to 4 m. Plan is to leave the hall by 4pm. Techs are unavailable between 2pm and 3:30pm.
+
* NPS crew (4/5 students. Tasks include checking some noisy channels, replacing temperature sensors electronics, possibly replacing a few bases.
 +
* Work needs to be completed by 3:30pm when the techs will return to move the calorimeter back to 4 m. Plan is to leave the hall by 4pm. Techs are unavailable between 2pm and 3:30pm.
 
* Techs also doing property inventory.
 
* Techs also doing property inventory.
  

Revision as of 09:19, 13 March 2024

Back to the calendar

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

  • Short term run plan [1]

Summary

RC update 13th March: https://logbooks.jlab.org/entry/4265984


Planned Access to the Hall

Maintenance day today

Hall C is in Controlled access. We plan the following work in the Hall:

  • NPS crew (4/5 students. Tasks include checking some noisy channels, replacing temperature sensors electronics, possibly replacing a few bases.
  • Work needs to be completed by 3:30pm when the techs will return to move the calorimeter back to 4 m. Plan is to leave the hall by 4pm. Techs are unavailable between 2pm and 3:30pm.
  • Techs also doing property inventory.

Accelerator

Maintenance day today with option of beam studies in INJ (https://logbooks.jlab.org/entry/4265990). Expect beam back for halls at ~21:00.

Run Plan