Tomorrow (Thursday) we would like to arrange an access to move the NPS calo back to 4m (currently it is at 3m). Also we can ask RadCon to survey the bases to be removed from the Hall.
 
  
 
= Accelerator =
 
= Accelerator =

Revision as of 11:11, 20 March 2024

Back to the calendar

RC Meeting Information

Current RC: Rachel Montgomery (rmontgom@jlab.org)

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

RC update 20th March: https://logbooks.jlab.org/entry/4269634

Planned Access to the Hall

Accelerator

MOmod tests were cancelled this morning due to a hardware issue. They won't plan to try it again any time soon (maybe in something like a couple of weeks).

Run Plan

  • We have almost cycled through both b and a settings for KinC_x50_0. We are just missing the last coin run on LD2 for a.
  • Continue at 3m with NPS at 14.4deg

Requests for shift crew

  • Please post screen shots to HCLOG as prompted in the run plan and of anything else appropriate that happens on shift.

Shift schedule

Looks good until Monday 25th March.