− | = Summary = | + | = Summary = |
+ | *Yesterday, while attempting to bring us back to production, there was a vacuum issue in the NE spreading. | ||
+ | *have been down since ~11 am yesterday. Prior to the vacuum issue, the calorimeter was moved from 3 to 4 meters. Unfortunately, no data has been taken at this 4 meter setting. | ||
+ | *This morning, will move the calorimeter back to 3 meters in anticipation of the resumption of beam. | ||
+ | *While beam has down, a short access was made into the hall during the SWING shift. Module C3-R3 was replaced. | ||
+ | *A full summary of the activities can be found in Josh's logbook entry: https://logbooks.jlab.org/entry/4270285 | ||
+ | *LED runs were taken during OWL shift. | ||
+ | *Presently, work continues to address the vacuum issue. They expect to have a clearer idea about the timeline for resuming beam delivery around noon today, | ||
= Planned Access to the Hall = | = Planned Access to the Hall = |
Revision as of 08:41, 22 March 2024
RC Meeting Information
Current RC: Michael Nycz (mnycz@jlab.org)
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
- Short term run plan [1]
- Shift Signup (Read only)
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
- Daily RC Reports
Summary
- Yesterday, while attempting to bring us back to production, there was a vacuum issue in the NE spreading.
- have been down since ~11 am yesterday. Prior to the vacuum issue, the calorimeter was moved from 3 to 4 meters. Unfortunately, no data has been taken at this 4 meter setting.
- This morning, will move the calorimeter back to 3 meters in anticipation of the resumption of beam.
- While beam has down, a short access was made into the hall during the SWING shift. Module C3-R3 was replaced.
- A full summary of the activities can be found in Josh's logbook entry: https://logbooks.jlab.org/entry/4270285
- LED runs were taken during OWL shift.
- Presently, work continues to address the vacuum issue. They expect to have a clearer idea about the timeline for resuming beam delivery around noon today,
Planned Access to the Hall
- 03/22/2024 - Move NPS to 3 meters: KinC_x50_0 / NPS = 14.40 deg