# SHMS and HMS Gas Cherenkov run in mode 10 as standard (prepare two coda configurations: one mode 9, and one mode 10); Cherenkov need different thresholds | # SHMS and HMS Gas Cherenkov run in mode 10 as standard (prepare two coda configurations: one mode 9, and one mode 10); Cherenkov need different thresholds | ||
+ | # Modify hcana to decode the FADC configuration file |
Latest revision as of 09:44, 8 January 2025
Back to Main Page >> Weekly meetings
Agenda
Notes
- The network switch in the LAD bunker is ready to use (hasn't gotten a chance to use it)
- The CAEN1190 TDC module and the vmeDSC modules in the LAD crate are set up and seen by CODA
- Fixed the SHMS scaler gate cables; Still need to check the helicity scalers and scalers in coincidence mode (https://logbooks.jlab.org/entry/4324349)
- Fixed the SHMS ROC4 FADC data corruption issue (https://logbooks.jlab.org/entry/4324574)
- SHMS still has scaler issue (https://logbooks.jlab.org/entry/4324605)
- Jmirror removes data file too early for cosmic runs issue (https://logbooks.jlab.org/entry/4324487): will use "touch" to keep the file live
- HMS cosmic plots (https://logbooks.jlab.org/entry/4323675)
- SHMS cosmic plots (https://logbooks.jlab.org/entry/4325305)
- LAD update (2 out of 5 installed. next week aim at 5)
- 4 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; (done)
To do:
- Set up vmeDSC configuration file
- GEM plan: one GEM has bad readout and wait for a new one shipped from Europe.
- SHMS and HMS Gas Cherenkov run in mode 10 as standard (prepare two coda configurations: one mode 9, and one mode 10); Cherenkov need different thresholds
- Modify hcana to decode the FADC configuration file