Difference between revisions of "Elong-14-04-04"

From HallCWiki
Jump to: navigation, search
(New page: =Q^2 Scan of Azz= With 24 PAC days + commissioning time, we can make a Q^2 scan of Azz from 0.8 (GeV/c)^2 < Q^2 < 2.0 (GeV/c)^2. The two higher points (1.2 and 2.0) seem to be the most in...)
 
(Q^2 Scan of Azz)
Line 9: Line 9:
 
|-
 
|-
 
|}
 
|}
 +
 +
  
 
{| border=1
 
{| border=1
Line 16: Line 18:
 
|-
 
|-
 
|}
 
|}
 +
 +
  
 
{| border=1
 
{| border=1
Line 23: Line 27:
 
|-
 
|-
 
|}
 
|}
 +
 +
  
 
{| border=1
 
{| border=1
Line 30: Line 36:
 
|-
 
|-
 
|}
 
|}
 +
 +
  
 
{| border=1
 
{| border=1

Revision as of 10:08, 4 April 2014

Q^2 Scan of Azz

With 24 PAC days + commissioning time, we can make a Q^2 scan of Azz from 0.8 (GeV/c)^2 < Q^2 < 2.0 (GeV/c)^2. The two higher points (1.2 and 2.0) seem to be the most interesting, but also take the most time (7 and 14 days, respectively). With an extra 3 days, we can also take points at Q^2=0.8, 0.6, and 0.3 (GeV/c)^2.

Q^2=2.0 (GeV/c)^2, E_{beam}=11.0 GeV, PAC Time = 336 hours
2014-04-04-q2-200.png


Q^2=1.2 (GeV/c)^2, E_{beam}=8.8 GeV, PAC Time = 168 hours
2014-04-04-q2-120.png


Q^2=0.8 (GeV/c)^2, E_{beam}=6.6 GeV, PAC Time = 36 hours
2014-04-04-q2-080.png


Q^2=0.6 (GeV/c)^2, E_{beam}=4.4 GeV, PAC Time = 12 hours
2014-04-04-q2-055.png


Q^2=0.3 (GeV/c)^2, E_{beam}=2.2 GeV, PAC Time = 6 hours
2014-04-04-q2-030.png