Difference between revisions of "Elong-2016-06-02"

From HallCWiki
Jump to navigationJump to search
(New page: '''Title''' Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries '''Days Requested for Approval''' 34 Physics + 11 Overhead '''Experiment Halls *''' C '''Pr...)
 
 
Line 1: Line 1:
 
'''Title'''   
 
'''Title'''   
 +
 
Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries
 
Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries
  
Line 10: Line 11:
 
'''Experiment Halls *'''
 
'''Experiment Halls *'''
  
C
+
C
  
  
'''Proposal Physics Goals:'''
+
'''Proposal Physics Goals
  
 
Indicate any Experiments that have physics goals similar to those in your proposal.
 
Indicate any Experiments that have physics goals similar to those in your proposal.
Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.
+
Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.'''
  
 
PR97-102
 
PR97-102
Line 28: Line 29:
 
   
 
   
 
N/A
 
N/A
Key Experiment Parameters
+
 
 +
 
 +
'''Key Experiment Parameters
  
 
List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)
 
List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)
 +
'''
 
   
 
   
 
32.6 Days at 8.8 GeV
 
32.6 Days at 8.8 GeV
 
10.4 Days at 6.6 GeV
 
10.4 Days at 6.6 GeV
 
1.3 Days at 2.2 GeV
 
1.3 Days at 2.2 GeV
List Range of Beam Currents: (e.g. 10-60 mA)
+
 
 +
 
 +
'''List Range of Beam Currents: (e.g. 10-60 mA)'''
 
   
 
   
 
80-90 nA
 
80-90 nA
Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)
+
 
 +
 
 +
'''Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)'''
 
   
 
   
 
HMS, SHMS, DNP Target
 
HMS, SHMS, DNP Target
Contact Us
+
 
 +
 
 +
'''Contact Us
  
 
Spokespersons
 
Spokespersons
 +
'''
 +
Spokeperson * Karl Slifer
 +
 +
Spokeperson * Patricia Solvignon
 +
 +
Spokeperson * Donal Day
  
Add Spokeperson
+
Spokeperson * Dustin Keller
Spokeperson *
+
 
Karl Slifer
+
Spokeperson * Douglas Higinbotham
Remove
+
 
Spokeperson *
+
'''Name *'''
Patricia Solvignon
 
Remove
 
Spokeperson *
 
Donal Day
 
Remove
 
Spokeperson *
 
Dustin Keller
 
Remove
 
Spokeperson *
 
Douglas Higinbotham
 
Remove
 
Name *
 
  
 
Elena Long
 
Elena Long
Institution
+
 
 +
'''Institution'''
  
 
University of New Hampshire
 
University of New Hampshire
Address
+
 
 +
'''Address'''
  
 
9 Library Way, DeMerritt Room 322
 
9 Library Way, DeMerritt Room 322
 +
 
City, State, ZIP/County
 
City, State, ZIP/County
  
 
Durham
 
Durham
Phone
+
 
 +
'''Phone
 +
'''
  
 
6038625312
 
6038625312
 +
 
Fax
 
Fax
  
 
N/A
 
N/A
Email Address *
+
 
 +
'''Email Address *'''
  
 
ellie@jlab.org
 
ellie@jlab.org
After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.
+
 
 +
'''After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.
 +
 
  
 
Author List
 
Author List
  
As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored.  
+
As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored. '''
File Format
 
  
Click here to view a sample file
 
  
Accepted extensions list:
+
'''Lab Resources List'''
.csv
 
.txt
 
Choose File
 
Clear
 
Proposal's Authors List
 
This section contains the saved proposal's authors.
 
  
Proposal does not contain any authors. To add an author follow the directions at the beginning of this section
+
'''List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.
Lab Resources List
+
'''
  
List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.
+
'''Major Installations'''
  
Major Installations
+
'''Equipment'''
 
 
Equipment
 
  
 
JLab/UVA DNP Target
 
JLab/UVA DNP Target
Support Structures
 
  
Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup
 
Data Aquisition/Reduction
 
  
Support Structures
+
'''Support Structures'''
  
N/A
+
Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup
Software
 
 
 
N/A
 
Major Equipment
 
  
Magnets
 
  
DNP Superconducting Magnet
+
'''Data Aquisition/Reduction'''
Power Supplies
 
 
 
~100A Magnet Power Supply for target
 
Targets
 
  
JLab/UVA DNP Target
+
'''Support Structures'''
Detectors
 
  
 
N/A
 
N/A
Electronics
 
  
N/A
+
'''Software'''
Computer Hardware
 
  
 
N/A
 
N/A
Other Resources
 
  
Slow raster
+
'''Major Equipment'''
Beam Requirement List
 
  
Hall Liaison:
+
'''Magnets'''
  
N/A
+
DNP Superconducting Magnet
List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.
 
  
Beam Requirements:
+
'''Power Supplies'''
Add Beam Requirement
 
Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness
 
Remove
 
2200
 
  
0.08
+
~100A Magnet Power Supply for target
  
Unpolarized
+
'''Targets'''
  
25
+
JLab/UVA DNP Target
Target Materials (1)
 
Add Target Material
 
*
 
  
ND3
+
'''Detectors
+
'''
*
 
  
3021
+
N/A
 
Remove
 
Remove
 
2200
 
  
0.08
+
'''Electronics'''
  
Unpolarized
+
N/A
  
6
+
'''Computer Hardware
Target Materials (1)
+
'''
Add Target Material
 
*
 
  
Carbon
+
N/A
 
*
 
  
3000
+
'''Other Resources
+
'''
Remove
 
Remove
 
8800
 
  
0.08
+
Slow raster
  
Unpolarized
+
'''Beam Requirement List
 +
''''''
  
776
+
Hall Liaison:'''
Target Materials (1)
 
Add Target Material
 
*
 
  
ND3
+
N/A
 
*
 
  
3000
+
'''List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.
 
Remove
 
Remove
 
8800
 
  
0.08
+
Beam Requirements:
 
+
Add Beam Requirement
Unpolarized
+
Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness
 
+
'''
6
 
Target Materials (1)
 
Add Target Material
 
*
 
 
 
Carbon
 
 
*
 
 
 
3000
 
 
Remove
 
Remove
 
6600
 
 
 
0.08
 
 
 
Unpolarized
 
 
 
244
 
Target Materials (1)
 
Add Target Material
 
*
 
 
 
ND3
 
 
*
 
  
3021
+
2200 0.08 Unpolarized 25 ND3 3021
 
Remove
 
Remove
 
6600
 
  
0.08
+
2200 0.08 Unpolarized 6 Carbon 3000
  
Unpolarized
+
8800 0.08 Unpolarized 776 ND3 3000
  
6
+
8800 0.08 Unpolarized 6 Carbon 3000
Target Materials (1)
 
Add Target Material
 
*
 
  
Carbon
+
6600 0.08 Unpolarized 244 ND3 3021
 
*
 
  
3000
+
6600 0.08 Unpolarized 6 Carbon 3000
 
   
 
   
Remove
+
'''
 
Hazard Identification Checklist
 
Hazard Identification Checklist
  
 
Check all items for which there is an anticipated need.
 
Check all items for which there is an anticipated need.
 +
'''
  
Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General
+
'''Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General
 
  Beamline Magnets
 
  Beamline Magnets
 
  Analysis Magnets
 
  Analysis Magnets
Line 281: Line 204:
 
Capacity  
 
Capacity  
 
101
 
101
Computing Requirement List
+
'''
 +
 
 +
'''Computing Requirement List
  
 
Silo/Mass Storage (Tape)
 
Silo/Mass Storage (Tape)
 +
'''
  
 
10 TB
 
10 TB
Amount of Simulated Data Expected
+
 
 +
'''Amount of Simulated Data Expected
 +
'''
  
 
50GB
 
50GB
Amount of Raw Data Expected(TB)
+
 
 +
'''Amount of Raw Data Expected(TB)
 +
'''
  
 
10
 
10
Amount of Processed Data Expected(TB)
+
 
 +
'''Amount of Processed Data Expected(TB)'''
  
 
50
 
50
Online Storage Disk Required (TB)
+
 
 +
'''Online Storage Disk Required (TB)'''
  
 
10
 
10
Imported Data Expected from Offsite Institution
+
 
 +
'''Imported Data Expected from Offsite Institution'''
  
 
N/A
 
N/A
Exported Data Expected to Offsite Locations
+
 
 +
'''Exported Data Expected to Offsite Locations'''
  
 
50GB
 
50GB
Computing
 
  
Simulation Requirements(SPEC CINT 2000hrs)
+
'''Computing'''
 +
 
 +
'''Simulation Requirements(SPEC CINT 2000hrs)'''
  
 
2000 hrs
 
2000 hrs
Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)
+
 
 +
'''Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)'''
  
 
20,000 hrs
 
20,000 hrs
Other Requirements  
+
 
Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.
+
'''Other Requirements  
 +
 
 +
Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.'''
  
 
N/A
 
N/A
Assumed Resource Requirements  
+
 
Use this section to provide any information regarding the assumed requirements for the resources needed.
+
'''Assumed Resource Requirements  
 +
 
 +
Use this section to provide any information regarding the assumed requirements for the resources needed.'''
  
 
N/A
 
N/A

Latest revision as of 13:57, 2 June 2016

Title

Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries


Days Requested for Approval

34 Physics + 11 Overhead


Experiment Halls *

C


Proposal Physics Goals

Indicate any Experiments that have physics goals similar to those in your proposal. Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.

PR97-102 LOI12-14-002 PR12-15-005


Collaboration-Approved Proposals:

If you will be running in parallel with an approved experiment, please indicate the experiment number

N/A


Key Experiment Parameters

List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)

32.6 Days at 8.8 GeV 10.4 Days at 6.6 GeV 1.3 Days at 2.2 GeV


List Range of Beam Currents: (e.g. 10-60 mA)

80-90 nA


Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)

HMS, SHMS, DNP Target


Contact Us

Spokespersons Spokeperson * Karl Slifer

Spokeperson * Patricia Solvignon

Spokeperson * Donal Day

Spokeperson * Dustin Keller

Spokeperson * Douglas Higinbotham

Name *

Elena Long

Institution

University of New Hampshire

Address

9 Library Way, DeMerritt Room 322

City, State, ZIP/County

Durham

Phone

6038625312

Fax

N/A

Email Address *

ellie@jlab.org

After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.


Author List

As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored.


Lab Resources List

List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.

Major Installations

Equipment

JLab/UVA DNP Target


Support Structures

Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup


Data Aquisition/Reduction

Support Structures

N/A

Software

N/A

Major Equipment

Magnets

DNP Superconducting Magnet

Power Supplies

~100A Magnet Power Supply for target

Targets

JLab/UVA DNP Target

Detectors

N/A

Electronics

N/A

Computer Hardware

N/A

Other Resources

Slow raster

Beam Requirement List '

Hall Liaison:

N/A

List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.

Beam Requirements: Add Beam Requirement Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness

2200 0.08 Unpolarized 25 ND3 3021

2200 0.08 Unpolarized 6 Carbon 3000

8800 0.08 Unpolarized 776 ND3 3000

8800 0.08 Unpolarized 6 Carbon 3000

6600 0.08 Unpolarized 244 ND3 3021

6600 0.08 Unpolarized 6 Carbon 3000

Hazard Identification Checklist

Check all items for which there is an anticipated need.

Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General

Beamline Magnets
Analysis Magnets
Target Magnets

Type Superconducting Flow Rate 5 l/hr Capacity 101

Computing Requirement List

Silo/Mass Storage (Tape)

10 TB

Amount of Simulated Data Expected

50GB

Amount of Raw Data Expected(TB)

10

Amount of Processed Data Expected(TB)

50

Online Storage Disk Required (TB)

10

Imported Data Expected from Offsite Institution

N/A

Exported Data Expected to Offsite Locations

50GB

Computing

Simulation Requirements(SPEC CINT 2000hrs)

2000 hrs

Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)

20,000 hrs

Other Requirements

Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.

N/A

Assumed Resource Requirements

Use this section to provide any information regarding the assumed requirements for the resources needed.

N/A