Difference between revisions of "Commissioning Plan 2017"

From HallCWiki
Jump to navigationJump to search
(New page: = 2017 Hall C Commissioning Plan (draft) =)
 
Line 1: Line 1:
 
= 2017 Hall C Commissioning Plan (draft) =
 
= 2017 Hall C Commissioning Plan (draft) =
 +
 +
== Magnet Field Setting ==
 +
 +
=== HMS ===
 +
* ALWAYS set DIPOLE by NMR coming DOWN from 900A <span style="color:red">- still true?</span>
 +
* Set QUADS by initially setting to a current of 200 A above the set currents (or the maximum current of 1100 A for Q1 if set current + 200 > 1100), and then coming DOWN.
 +
 +
=== SHMS ===
 +
* Set HB magnet to 1500 A and then go up or down setting HB by NMR
 +
* Set QUADS … <span style="color:red">- need Q1 mapping data in form we can decide on this</span>
 +
 +
 +
Set DIPOLE by NMR (or with Hall Probe at highest momentum settings, not relevant for this commissioning plan) …

Revision as of 14:14, 5 January 2017

2017 Hall C Commissioning Plan (draft)

Magnet Field Setting

HMS

  • ALWAYS set DIPOLE by NMR coming DOWN from 900A - still true?
  • Set QUADS by initially setting to a current of 200 A above the set currents (or the maximum current of 1100 A for Q1 if set current + 200 > 1100), and then coming DOWN.

SHMS

  • Set HB magnet to 1500 A and then go up or down setting HB by NMR
  • Set QUADS … - need Q1 mapping data in form we can decide on this


Set DIPOLE by NMR (or with Hall Probe at highest momentum settings, not relevant for this commissioning plan) …