Meeting Information
- Location CC L210A, 11 am
- DocDB
Blue Jeans Connection Information
- https://bluejeans.com/895800575
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 895800575
- Press #
Agenda
- Status update from detector owners, calibrations, efficiencies, etc.
- SHMS Drift Chambers Status Update & To-Do - Eric Christy
- Doc on the SHMS Shower - Dave Mack
- Discuss measurement of field at detector PMTs.
- Discuss whether trigger should be modified. Scaler logbook entry
- Vardan to discuss SHMS shower calibrations Logbook entry
- HMS DC Efficiency - Carlos Yero
- HMS Hodoscope Calibration Results - Simona Malace
- Review systems owners and update information
- Commissioning plan updates from detector systems
- Address system specific points of interest for the Fall 2017 run
Minutes
General
- Joerg Rheinhold mentioned that the field at the aerogel PMT's should be simulated/measured
- Steve saw no field with a probe
- A logbook entry is needed with simulation calculations and measurements
- Mark showed some slides regarding the rates in the SHMS
- Currently we have the maximum accidental rate
- The question is weather or not we need to modify the current trigger logic
- This is a very invasive procedure
Beam Line
- No update provided
Trigger/DAQ
- No update provided
HMS
6 GeV Drift Chambers
- Carlos showed some slides regarding the HMS drift chamber per wire efficiencies
- Two planes in DC2 had an incorrect mapping, when fixed the efficiencies look good
12 GeV Drift Chambers
- The chambers are the same structure as SHMS and they are built, tested, and stable
- Each chambers has a couple of wires with no signals, the problem is likely internal
- Per chamber there are 2 wires that are dead, one is in the corner
- If necessary the chambers could be opened up and the wires diagnosed and fixed
- Cables need to be made and tested
- Brad Sawatzky has a DAQ which can test a single chamber and if needed then he could integrate another fast bus crate to test both simultaneously
- We need 76 discriminator cards for the new chambers we need to see how many are available
- There are 72 in HMS currently
Hodoscopes
- Simona showed some slides regarding the first stab at the calibrations
- More tweaks are required, and more diagnostic plots to come
Aerogel
- No update provided
Heavy Gas Cherenkov
- No update provided
Shower
- Vardan reported that the HMS calorimeter was calibrated utilizing run 303 and is close to previous HMS/SOS analyses
SHMS
GEM
- The GEM has been installed between the SHMS drift chambers, see the logbook entry:
- The GEM DAQ has been installed in the SHMS electronics hut
- Work is ongoing to setup the DAQ so that it can eventually be configured into the Hall C DAQ
Nobel Gas Cherenkov
- No update provided
Drift Chambers
- Eric Christy showed some slides
- The SHMS chambers performed well
- There were 2 dead wires although it is though that these can be recovered
- t0 offsets per wire have been implemented and the residuals have improved as expected
- The two planes with low efficiencies contained the missing wires
- Drift time along the wire is not completely understood at the moment, this will be looked into at a later date
- The residuals have been reduced to 300 um
- Ideally after alignment they expect to obtain a resolution on the order of 150 um
Hodoscopes
- Simona wants Sam to educate her on how to mount the PMT's to the quartz bar, this should happen during the second half of May
- Dave mentioned that Sam might want to check on the expiration date of the glue
- She will measure the quantum efficiency from moving to UV gas from the quartz glass
- She is working with a vendor to commit to a particular spec for the UV glass, however their typical a unicorn
- A DAQ setup is currently installed in the Hall, work is ongoing for the trigger
- Lead time on the new tubes is 12 weeks
- The first step is a QE measurement followed by a gain curve, Carl Zorn said he will help with this
Heavy Gas Cherenkov
- No update provided
Aerogel Cerenkov
- No update provided
Shower/Pre-shower
- Dave Mack showed some slides regarding the HERMES XP3461 base modeling, see his slides
- This is a follow up of the slides he showed last DWG meeting
- He plans to model the gain and compare the difference between. the XP3462s
- Vardan showed a slide from his logbook entry
- SHMS calibration was C++ code written based on HMS and SOS Fortran code
- The resolution improves for run 484 where the HV was increased by 100V
- The SHMS calorimeter is behaving as expected
- Hamlet commented that the resolutions we are obtaining are much better than what was obtained by the HERMES collaboration