Difference between revisions of "Wednesday, June 28, 2017"

From HallCWiki
Jump to navigationJump to search
m
m (Added the visualizations for NPE in the HGC)
Line 17: Line 17:
 
# Commissioning plan updates from detector systems
 
# Commissioning plan updates from detector systems
 
# Status update from detector owners, calibrations, efficiencies, etc.
 
# Status update from detector owners, calibrations, efficiencies, etc.
 +
##Calibration of the [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=870 HGC]
 
# Review systems owners and update information
 
# Review systems owners and update information
 
# Address system specific points of interest for the Fall 2017 run
 
# Address system specific points of interest for the Fall 2017 run

Revision as of 08:04, 28 June 2017

Meeting Information

  • Location CC L210A, 11 am
  • DocDB

Blue Jeans Connection Information

  1. Enter Meeting ID: 895800575
  2. Press #

Agenda

  1. Survey of HMS and SHMS spectrometers. Presently doing surveys to set the angle plates for the SHMS. Do we need surveys for the HMS plates?
  2. Commissioning plan updates from detector systems
  3. Status update from detector owners, calibrations, efficiencies, etc.
    1. Calibration of the HGC
  4. Review systems owners and update information
  5. Address system specific points of interest for the Fall 2017 run
  6. Hall C Background Helium

Minutes

General

Miscellaneous

Beam Line

Trigger/DAQ

HMS

6 GeV Drift Chambers

12 GeV Drift Chambers

Hodoscopes

Aerogel

Heavy Gas Cherenkov

Shower

SHMS

GEM

Nobel Gas Cherenkov

Drift Chambers

Hodoscopes

Heavy Gas Cherenkov

Aerogel Cerenkov

Shower/Pre-shower