Difference between revisions of "Wednesday, August 23, 2017"
From HallCWiki
Jump to navigationJump to searchLine 25: | Line 25: | ||
=== Beam Line === | === Beam Line === | ||
− | Update on BCM Studies and Calibrations by Deepak | + | #Update on BCM Studies and Calibrations by Deepak |
− | + | #See Link. [https://hallcweb.jlab.org/DocDB/0008/000883/001/Presentation_08_23.pdf Checking Keithley Current Source with a Newly Calibrated Multimeter] - Deepak Bhetuwal | |
=== Trigger/DAQ === | === Trigger/DAQ === | ||
− | + | #Recent update on Trigger/DAQ in preparation for Hall C Fall-2017/Spring-2018 | |
commissioning experiments. Main work has been to clean up unnecessary cable, | commissioning experiments. Main work has been to clean up unnecessary cable, | ||
and re-route some badly placed cables | and re-route some badly placed cables | ||
+ | # [https://hallcweb.jlab.org/DocDB/0008/000884/001/Recent_Trigger_DAQ_Work.pdf Recent Trigger/DAQ Work] -Carlos Yero | ||
-EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working | -EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working | ||
Line 38: | Line 39: | ||
==== Magnets ==== | ==== Magnets ==== | ||
− | + | #characterize Q2 behavior : checking for cross-talk polarity asymmetries, linearity | |
− | + | #Dave Mack is skeptical about the errors obtained in the measurement of Q2 field using the Hall probe. | |
− | + | #The hall probe might not work as it should for such strong magnetic field gradients according to D. Mack | |
+ | #[https://userweb.jlab.org/~hszumila/hallc/q2update_23aug17.pdf Q2 Measurements Update] - Holly |
Revision as of 11:04, 23 August 2017
Meeting Information
- Location CC L210A, 11 am
- DocDB
Blue Jeans Connection Information
- https://bluejeans.com/895800575
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 895800575
- Press #
Agenda
- Commissioning plan updates from detector systems
- Status update from detector owners, calibrations, efficiencies, etc.
- Checking Keithley Current Source with a Newly Calibrated Multimeter - Deepak Bhetuwal
- Recent Trigger/DAQ Work -Carlos Yero
- Q2 Measurements Update - Holly
- Review systems owners and update information
- Address system specific points of interest for the Fall 2017 run
Minutes
Beam Line
- Update on BCM Studies and Calibrations by Deepak
- See Link. Checking Keithley Current Source with a Newly Calibrated Multimeter - Deepak Bhetuwal
Trigger/DAQ
- Recent update on Trigger/DAQ in preparation for Hall C Fall-2017/Spring-2018
commissioning experiments. Main work has been to clean up unnecessary cable, and re-route some badly placed cables
- Recent Trigger/DAQ Work -Carlos Yero
-EDTM electronics for HMS/SHMS hodoscopes has been set-up and verified to be working
SHMS
Magnets
- characterize Q2 behavior : checking for cross-talk polarity asymmetries, linearity
- Dave Mack is skeptical about the errors obtained in the measurement of Q2 field using the Hall probe.
- The hall probe might not work as it should for such strong magnetic field gradients according to D. Mack
- Q2 Measurements Update - Holly