Difference between revisions of "Commissioning Plan 2017"
From HallCWiki
Jump to navigationJump to searchm |
|||
Line 144: | Line 144: | ||
*Run Plan: MCC procedure | *Run Plan: MCC procedure | ||
− | + | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Vertically center beam to HMS == | == Vertically center beam to HMS == | ||
Line 189: | Line 168: | ||
*Run Plan: | *Run Plan: | ||
− | == | + | == Initial checkout of SHMS tune == |
* Experts: | * Experts: | ||
* Expected time: ? hour | * Expected time: ? hour | ||
Line 210: | Line 189: | ||
! SHMS angle/momentum || 25 deg, -1.6 GeV/c | ! SHMS angle/momentum || 25 deg, -1.6 GeV/c | ||
|} | |} | ||
− | * | + | *Run Plan: |
*You can also use [https://hallcweb.jlab.org/wiki/images/c/c5/160512_jure_fp_patterns.pdf these plots] to help guide the setting of the quadrupoles. | *You can also use [https://hallcweb.jlab.org/wiki/images/c/c5/160512_jure_fp_patterns.pdf these plots] to help guide the setting of the quadrupoles. | ||
− | == | + | == Fine Tune SHMS with Carbon Elastic == |
* Experts: | * Experts: | ||
* Expected time: ? hour | * Expected time: ? hour | ||
Line 224: | Line 203: | ||
! fast raster: || off | ! fast raster: || off | ||
|- | |- | ||
− | ! target: || 0.5% carbon | + | ! target: || 0.5% carbon |
|- | |- | ||
! HMS/SHMS collimator: || SIEVE , CENTERED SIEVE | ! HMS/SHMS collimator: || SIEVE , CENTERED SIEVE | ||
|- | |- | ||
− | ! HMS/SHMS trigger: || SCIN 3/4,SCIN 3/4 | + | ! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 |
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || 12. deg, 2.2 GeV/c |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || 7.5 deg, 2.1 GeV/c |
|} | |} | ||
− | * | + | *Run Plan: |
− | |||
− | |||
− | |||
− | |||
− | |||
− | == | + | == SHMS Delta Matrix calibration == |
* Experts: | * Experts: | ||
* Expected time: ? hour | * Expected time: ? hour | ||
Line 253: | Line 227: | ||
! fast raster: || off | ! fast raster: || off | ||
|- | |- | ||
− | ! target: || | + | ! target: || 0.5% carbon |
|- | |- | ||
− | ! HMS/SHMS collimator: || | + | ! HMS/SHMS collimator: || PION , COLLIMATOR |
|- | |- | ||
! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ||
|- | |- | ||
− | ! HMS angle/momentum || 12. deg, 2. | + | ! HMS angle/momentum || 12. deg, -2.1 GeV/c |
|- | |- | ||
− | ! SHMS angle/momentum || 7.5 deg, 2.1 GeV/c | + | ! SHMS angle/momentum || 7.5 deg, -2.1 GeV/c |
|} | |} | ||
− | * | + | *Run Plan: |
+ | *Try with different vertical and horizontal beam positions. | ||
− | == | + | == SHMS Angle and Position Matrix Optimization == |
* Experts: | * Experts: | ||
* Expected time: ? hour | * Expected time: ? hour | ||
− | * Goal: | + | * Goal: SHMS angle and position matrix optimization |
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
Line 277: | Line 252: | ||
! fast raster: || off | ! fast raster: || off | ||
|- | |- | ||
− | ! target: || 0.5% carbon | + | ! target: || 0.5% carbon, optics targets |
|- | |- | ||
! HMS/SHMS collimator: || PION , COLLIMATOR | ! HMS/SHMS collimator: || PION , COLLIMATOR | ||
Line 283: | Line 258: | ||
! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ||
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || 25. deg, -1.6 GeV/c |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || 25 deg, -1.6 GeV/c |
|} | |} | ||
*Run Plan: | *Run Plan: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Target boiling study == | == Target boiling study == |
Revision as of 16:34, 6 November 2017
HMS/SHMS Magnet Cycling Procedures
HMS
- ALWAYS set DIPOLE by NMR coming DOWN from 900 A
- Set QUADS by initially setting to a current of 200 A above the set currents (or the maximum current of 1100 A for Q1 if set current + 200 > 1100), and then coming DOWN.
SHMS
- General principal: A magnet will be “on loop” if it has been taken to Imax (11 GeV) and stays on the descending branch of the hysteresis loop. Otherwise it is "off loop"
- Cycle procedure: Go to Imax and descend to target current.
- Action logic table
Status/Action | Magnet status is “on loop” | Magnet status is “off loop” |
Increasing abs(p) at this polarity | Descend to target current | Cycle |
Decreasing abs(p) at this polarity | Cycle | Cycle |
Changing polarity | Set to 0 current, switch polarity, cycle | Set to 0 current, switch polarity, cycle |
Beam energy of 2.2 GeV
Initial conditions
- HMS/SHMS angle surveys.
- Beamline BPM and Harp surveys. Check offsets in MCC database.
- HMS/SHMS Conditions:
HMS/SHMS collimator: | PION , COLLIMATOR |
---|---|
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
Beam Checkout with Superharps and Beam Position Monitors
- Experts: Mark Jones
- Expected time: 3 hours
- Goals: Initial measurement of beam spot size. Followed by calibration of girder BPMs at 5,30 and 60uA. Measure raster size with superharps.
- Conditions:
beam current: | 5,30 and 60 μA |
---|---|
fast raster: | off |
target: | none |
- Runplan: pdf file
Center beam on C-hole target
- Experts:
- Expected time: 1 hour
- Goal: Center beam on carbon hole target
- Conditions:
beam current: | 5 μA |
---|---|
fast raster: | 3x3mm |
target: | carbon hole |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run plan:
- Take singles data in both arms. Analyze using the raster script.
- Once beam centered on target, then can check the "halo" target.
- Record Girder BPMs. Will use these beam positions until beam centering with HMS.
Initial HMS/SHMS Detector Checkout
- SHMS/HMS optics experts:
- HMS DC experts:
- Expected time: 1 hour
- Goal: Initial checkout of the HMS/SHMS detectors. Working well enough for carbon elastics data and initial checkout of the SHMS/HMS tunes.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run Plan:
- Need to have rough calibration of BCM1 and BCM2.
- First check trigger rates ( 4kHz at 20uA), background triggers rate
- Confirm the HMS DC tracking is working properly and efficiency is high.
- Compare HMS/SHMS focal plane plots to MC simulation.
- Adjust SHMS Q2 strength if needed.
BCM Calibration
- Experts: Dave Mack
- Expected time: ? hours
- Goal:
- Conditions:
beam current: | 1-60 μA |
---|---|
fast raster: | off |
target: | none |
- Run Plan:
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- Run Plan: MCC procedure
Vertically center beam to HMS
- Experts:
- Expected time: ? hour
- Goal: Determine the vertical beam position which centers the sieve in the focal plane.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE |
HMS/SHMS trigger: | SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run Plan:
Initial checkout of SHMS tune
- Experts:
- Expected time: ? hour
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE , CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run Plan:
- You can also use these plots to help guide the setting of the quadrupoles.
Fine Tune SHMS with Carbon Elastic
- Experts:
- Expected time: ? hour
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE , CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 12. deg, 2.2 GeV/c |
SHMS angle/momentum | 7.5 deg, 2.1 GeV/c |
- Run Plan:
SHMS Delta Matrix calibration
- Experts:
- Expected time: ? hour
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 12. deg, -2.1 GeV/c |
SHMS angle/momentum | 7.5 deg, -2.1 GeV/c |
- Run Plan:
- Try with different vertical and horizontal beam positions.
SHMS Angle and Position Matrix Optimization
- Experts:
- Expected time: ? hour
- Goal: SHMS angle and position matrix optimization
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon, optics targets |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25. deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
- Run Plan:
Target boiling study
- Experts:
- Expected time: hour
- Goal: Verify beam spot size
- Conditions:
beam current: | 5-60 μA |
---|---|
fast raster: | 1x1mm |
target: | 10cm LH2, 10cm LD2, 10cm dummy |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25. deg, -1.6 GeV/c |
SHMS angle/momentum | 25. deg, -1.6 GeV/c |
Beam energy of 6.4 GeV
Initial conditions
- HMS/SHMS Conditions:
HMS/SHMS collimator: | PION , COLLIMATOR |
---|---|
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Superharp Scan
- Experts: Mark Jones
- Expected time: 1/2 hour
- Goal: Verify beam spot size
- Conditions:
beam current: | 5 μA |
---|---|
fast raster: | off |
target: | none |
- Ask MCC to do superharp scan with superharps IHA3H07A and IHA3H07B and put entry in ELOG. Record the 3 BPMs positions (3H07A,3H07B,3H07C) during scan.
- Want beam spot with sigma_x and sigma_y below 200 um ( beam pass 1-4) and below 300 um for beam pass 5.
- Verify Girder BPM position to Harp positions.
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3.0 GeV/c |
SHMS angle/momentum | 15. deg, -3.0 GeV/c |
Detailed Detector Checkout
- Experts:
- Expected time: ? hour
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE , CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 25 deg, -1.6 GeV/c |
SHMS angle/momentum | 25 deg, -1.6 GeV/c |
Wire Chamber
- SHMS Run plan:
- HMS Run plan:
Shower Counter Calibration Run
- SHMS Run plan:
- HMS Run plan:
Scintillator
- SHMS Run plan:
- HMS Run plan:
Cerenkov
- SHMS Heavy Gas Cherenkov: calibration plan
- HMS Run plan:
Aerogel
- SHMS Run plan:
Set Discriminator Thresholds for (P.Id.) Trigger
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3.0 GeV/c |
SHMS angle/momentum | 15. deg, -3.0 GeV/c |
Defocused Run HMS and SHMS
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15. deg, -3.0 GeV/c |
SHMS angle/momentum | 15. deg, -3.0 GeV/c |
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
1H or 12C(eep) [3 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 3% carbon, 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
1H or 12C(e, e’ π) [2 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 3% carbon, 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 16.8 deg, -3.8 GeV/c |
SHMS angle/momentum | 20.0 deg, +2.7 GeV/c |
1H(e’K) and 1H(e, e’K) [3 hr]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 25.0 deg, -2.6 GeV/c |
SHMS angle/momentum | 15.0 deg, +3.6 GeV/c |
Coincidence Checkout [16 hrs]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION/SIEVE , COLLIMATOR/CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
- We will take a set of 1H(e,e’p) measurements to check the angle and dp/p offsets for the spectrometers. Use a current of 50 μA if possible. Rotate both HMS and SHMS to -27.5° again (or keep them there if already at that angle). Keep both HMS and SHMS at a central momentum of -3.609 GeV/c. First use the sieve slit on the SHMS side and the central Carbon optics target. Use the Particle Id. trigger, and measure about 2K singles in SHMS (that should take about one hour). Now install the 10 cm hydrogen target and measure about 2K singles in SHMS (that is again about one hour). Now take a coincidence spectrum in the same situation, again a measurement of about one hour. Remove the sieve slit on the SHMS side and use the large collimator. Measure a coincidence spectrum for one hour (rate should be 4 Hz, so this will get >10K statistics). Now install the sieve slit on the HMS side and measure another coincidence spectrum for a few hours (a few K statistics).
Elastic p(ep) Checkout
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
- Take runs to acquire roughly 10K events for HMS (use the large pion collimator!) at angles of 27.5°, 28.8°, 30.1°, 24.9°, and 26.2°. For SHMS at identical angles but also at angles of 31.8°, 33.5°, 35.2° and 23.2°. Roughly, at the central setting you need 45 minutes to acquire 10K statistics, and less at the lower angles, but perhaps 1.5 hour at 30.1°, and up to 5 hours at the largest SHMS angle of 35.2°.
Sieve slit measurement with C Optics “Extended” Target – Part I
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered Sieve |
HMS/SHMS trigger: | , |
HMS angle/momentum | 25. deg, -3.0 GeV/c |
SHMS angle/momentum | 25. deg, -3.0 GeV/c |
Sieve slit measurement with C Optics “Extended” Target – Part II
- Experts:
- Expected time:
- Goal: Calibrate HMS ytgt, yptar and xptar for 10cm target.
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered Sieve |
HMS/SHMS trigger: | , |
HMS angle/momentum | 50. deg, -2.0 GeV/c |
SHMS angle/momentum | 25. deg, -2.0 GeV/c |
Check spectrometer pointing
- Experts:
- Expected time:
- Goal: Measure the HMS/SHMS spectrometer pointing
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | Sieve, Centered sieve |
HMS/SHMS trigger: | , |
HMS angle/momentum | 12.-60 deg, -3.0 GeV/c |
SHMS angle/momentum | 7.5-40 deg, -3.0 GeV/c |
Beam energy of 8.8 GeV
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | |
SHMS angle/momentum |
1H(eep)
Beam energy of 10.6 GeV
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
1H(eep)
SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | off |
target: | 3% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | |
SHMS angle/momentum |