Difference between revisions of "Spring 2018 Commissioning"
From HallCWiki
Jump to navigationJump to search (Created page with "= Overview = Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here. = DAQ/Trigger Run Plans = = Talks = = Log Book Ent...") |
|||
Line 2: | Line 2: | ||
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here. | Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here. | ||
+ | |||
+ | = To-Do = | ||
+ | |||
+ | * High Priority | ||
+ | ** Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis) | ||
+ | ** Configure NGC into SHMS PID trigger leg in place of HGC | ||
+ | ** Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run) | ||
+ | ** Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf) | ||
+ | ** Remove layer B from HMS pre-shower sum | ||
+ | |||
+ | * Medium Priority | ||
+ | ** Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value | ||
+ | ** Include multi-hit capability in the trigger apparatus for reference times | ||
+ | ** Integrate TI scalers into report files | ||
+ | ** Configure OR of hodoscope trigger logic into TDC’s and scalers | ||
+ | ** Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler) | ||
+ | |||
+ | * Low Priority | ||
+ | ** Add number of FADC error flags to the report files (front and center) | ||
+ | ** Add number of pulses identified in the window to data tree | ||
= DAQ/Trigger Run Plans = | = DAQ/Trigger Run Plans = | ||
+ | * SHMS & HMS Mode 10 runs | ||
+ | |||
+ | |||
+ | |||
+ | * Single arm EDTM runs at various rates | ||
+ | |||
+ | |||
+ | |||
+ | * Coincidence EDTM runs at various rates | ||
+ | |||
+ | |||
+ | |||
+ | * SHMS PID threshold scan with NGC in trigger (HGC was previously utilized) | ||
+ | |||
+ | |||
+ | |||
+ | * Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel) | ||
+ | |||
+ | |||
+ | |||
+ | * Trigger PID threshold scans | ||
Revision as of 09:06, 9 January 2018
Overview
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.
To-Do
- High Priority
- Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis)
- Configure NGC into SHMS PID trigger leg in place of HGC
- Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run)
- Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf)
- Remove layer B from HMS pre-shower sum
- Medium Priority
- Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value
- Include multi-hit capability in the trigger apparatus for reference times
- Integrate TI scalers into report files
- Configure OR of hodoscope trigger logic into TDC’s and scalers
- Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler)
- Low Priority
- Add number of FADC error flags to the report files (front and center)
- Add number of pulses identified in the window to data tree
DAQ/Trigger Run Plans
- SHMS & HMS Mode 10 runs
- Single arm EDTM runs at various rates
- Coincidence EDTM runs at various rates
- SHMS PID threshold scan with NGC in trigger (HGC was previously utilized)
- Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel)
- Trigger PID threshold scans