Line 12: | Line 12: | ||
** Remove layer B from HMS pre-shower sum | ** Remove layer B from HMS pre-shower sum | ||
− | * <span style="color: | + | * <span style="color:orange"> Medium Priority </span> |
** Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value | ** Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value | ||
** Include multi-hit capability in the trigger apparatus for reference times | ** Include multi-hit capability in the trigger apparatus for reference times | ||
Line 19: | Line 19: | ||
** Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler) | ** Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler) | ||
− | * <span style="color: | + | * <span style="color:green"> Low Priority </span> |
** Add number of FADC error flags to the report files (front and center) | ** Add number of FADC error flags to the report files (front and center) | ||
** Add number of pulses identified in the window to data tree | ** Add number of pulses identified in the window to data tree |
Revision as of 09:08, 9 January 2018
Overview
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.
To-Do
- High Priority
- Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis)
- Configure NGC into SHMS PID trigger leg in place of HGC
- Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run)
- Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf)
- Remove layer B from HMS pre-shower sum
- Medium Priority
- Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value
- Include multi-hit capability in the trigger apparatus for reference times
- Integrate TI scalers into report files
- Configure OR of hodoscope trigger logic into TDC’s and scalers
- Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler)
- Low Priority
- Add number of FADC error flags to the report files (front and center)
- Add number of pulses identified in the window to data tree
DAQ/Trigger Run Plans
- SHMS & HMS Mode 10 runs
- Single arm EDTM runs at various rates
- Coincidence EDTM runs at various rates
- SHMS PID threshold scan with NGC in trigger (HGC was previously utilized)
- Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel)
- Trigger PID threshold scans