Difference between revisions of "RC meeting and Run Plan, Wed Oct. 10"

From HallCWiki
Jump to: navigation, search
(Created page with "*''Status'' ** Data taken so far [https://hallcweb.jlab.org/wiki/index.php/Kaon_LT_Status_Page] ** Beam quality [https://logbooks.jlab.org/entry/3607246] *** Beam issues, no d...")
 
Line 3: Line 3:
 
** Beam quality [https://logbooks.jlab.org/entry/3607246]
 
** Beam quality [https://logbooks.jlab.org/entry/3607246]
 
*** Beam issues, no data until 21:40pm
 
*** Beam issues, no data until 21:40pm
 
+
*** Lost ~90minutes due to beam dump water flow alert (see below).
 
+
*''Issues: Resolved''
+
**Beam issues,
+
  
 
*''Requiring attention''
 
*''Requiring attention''
Line 13: Line 10:
 
***BUT... around 10:30 downtime created for the same alert [https://logbooks.jlab.org/entry/3607122]
 
***BUT... around 10:30 downtime created for the same alert [https://logbooks.jlab.org/entry/3607122]
 
***Again resolved by masking ...after 49 minutes
 
***Again resolved by masking ...after 49 minutes
***Need to make sure this gets communicated to the next crew
+
***Need to make sure this gets '''communicated to the next crew''' if needed
 
+
  
 
*''Plans - Physics ''
 
*''Plans - Physics ''
Line 21: Line 17:
 
**Change SHMS angle to 6.48 deg, take Al and LH2 data
 
**Change SHMS angle to 6.48 deg, take Al and LH2 data
 
***Coordinate with Holly in case we trigger rotation alarm.
 
***Coordinate with Holly in case we trigger rotation alarm.
 +
***Coordinate with Jay to see if we still need new limits for the ion chamber diffusors at this angle [https://logbooks.jlab.org/entry/3602848]
 
***Projected to put us sometime in the weekend
 
***Projected to put us sometime in the weekend

Revision as of 16:19, 10 October 2018

  • Status
    • Data taken so far [1]
    • Beam quality [2]
      • Beam issues, no data until 21:40pm
      • Lost ~90minutes due to beam dump water flow alert (see below).
  • Requiring attention
    • Around midnight beam dump water flow alert (flow too high) [3]
      • Ultimately resolved by masking [4]
      • BUT... around 10:30 downtime created for the same alert [5]
      • Again resolved by masking ...after 49 minutes
      • Need to make sure this gets communicated to the next crew if needed
  • Plans - Physics
    • Take data at Q2=3. W=3.14 x=0.25 theta_Shms=9.42 to reach 66% of desired stat. goal., then take Al.
      • Projected to take until tomorrow 4pm
    • Change SHMS angle to 6.48 deg, take Al and LH2 data
      • Coordinate with Holly in case we trigger rotation alarm.
      • Coordinate with Jay to see if we still need new limits for the ion chamber diffusors at this angle [6]
      • Projected to put us sometime in the weekend