* The preshower has been cabled with signal and HV.
 
* The preshower has been cabled with signal and HV.
 
* Have checked setting each channel to 1400V that signal is seen.
 
* Have checked setting each channel to 1400V that signal is seen.
*06/28 Taking data for number of hits through calorimeter and external PMT's
+
*06/28 Taking data for number of events through calorimeter and external PMT's
  
 
== Computer Setup ==
 
== Computer Setup ==

Revision as of 14:52, 28 June 2012

Status

  • The preshower has been cabled with signal and HV.
  • Have checked setting each channel to 1400V that signal is seen.
  • 06/28 Taking data for number of events through calorimeter and external PMT's

Computer Setup

  • Computer is called cnu. The account is gep5.

HV Setup

  • Can control the CAEN 403 through terminal on cnu.
    • Open terminal
    • type "su" to login as superuser.
    • type "minicom"
  • Preshower HV cabling map