Line 2: Line 2:
  
 
= RC Meeting Information =
 
= RC Meeting Information =
 +
 +
==== No Meeting today ====
  
 
<b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b>
 
<b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b>

Revision as of 16:06, 23 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

No Meeting today

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Continued running J/Psi on kinematic setting 3 high-t
  • SHMS HB problems right after last meeting. Called Steve. Jack came to help remote reboot of the PLC. This seemed to fix things.
  • Strange target alarms. Loss of cooling power?
  • Running at 55 -60 uA. Will ask for more if beam is stable.
  • Replace camera 3 (temporarily). Needs better cable placement.
  • Might turn off camera rotation. Need to follow up with Steve.

Current Run Plan

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Use the script do_coin_50k.sh to run the 50k replays. This will run both arm's first 50k replay. Then after ~500k events run a 50k replay for events 550k to 600k.

If you want to manually run each script, you can use a third argument to the standard 50k scripts which is the event number.


Current Issues

  • Need to notify Steve to turn on rotation controller before rotation.

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests