Difference between revisions of "RC Meeting and Run Plan, Saturday, February 23"

From HallCWiki
Jump to: navigation, search
(Current Issues)
(Planned Accesses to the Hall)
Line 34: Line 34:
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*
+
* Latif will access the Hall on Monday (during beam studies) for GEM tests. This will require running a different DAQ configuration. This will take "a few hours".
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Revision as of 16:11, 23 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

No Meeting today

Useful Links

Current Status

  • Continued running J/Psi on kinematic setting 3 high-t
  • The target alarm situation where the heater goes to zero was occurring more frequently Friday evening.

Current Run Plan

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Use the script do_coin_50k.sh to run the 50k replays. This will run both arm's first 50k replay. Then after ~500k events run a 50k replay for events 550k to 600k.

If you want to manually run each script, you can use a third argument to the standard 50k scripts which is the event number.


Current Issues

  • Target rotation controller is turned off. Notify Steve Lassiter before any required rotations.

Planned Accesses to the Hall

  • Latif will access the Hall on Monday (during beam studies) for GEM tests. This will require running a different DAQ configuration. This will take "a few hours".

Planned Accelerator Configuration Changes

Special Requests