Difference between revisions of "Shutting off HMS LCW"
From HallCWiki
Jump to navigationJump to search (Created page with "* Monitor the small HMS LCW leak on the hall cameras. If the leak becomes significantly larger, we need to shut off the HMS LCW valves quickly. * Call MCC and tell them you n...") |
|||
Line 1: | Line 1: | ||
* Monitor the small HMS LCW leak on the hall cameras. If the leak becomes significantly larger, we need to shut off the HMS LCW valves quickly. | * Monitor the small HMS LCW leak on the hall cameras. If the leak becomes significantly larger, we need to shut off the HMS LCW valves quickly. | ||
* Call MCC and tell them you need an escorted access - and you need access urgently (losing too much LCW could impact ESR operations). | * Call MCC and tell them you need an escorted access - and you need access urgently (losing too much LCW could impact ESR operations). | ||
+ | * Ask the target operator to start ramping down the HMS magnets | ||
+ | * While waiting for the Arm to escort you into the hall, call the Spectrometer on Call number (593-7890) and tell them you are about to shut off LCS to the HMS and that they should drain the water cooled current leads. | ||
+ | * In the hall: | ||
+ | == Locate the target gas panel == | ||
+ | [[Image:Gas_panel.jpg.jpg|200px|Gas Panel]] |
Revision as of 15:29, 8 July 2019
- Monitor the small HMS LCW leak on the hall cameras. If the leak becomes significantly larger, we need to shut off the HMS LCW valves quickly.
- Call MCC and tell them you need an escorted access - and you need access urgently (losing too much LCW could impact ESR operations).
- Ask the target operator to start ramping down the HMS magnets
- While waiting for the Arm to escort you into the hall, call the Spectrometer on Call number (593-7890) and tell them you are about to shut off LCS to the HMS and that they should drain the water cooled current leads.
- In the hall: