Difference between revisions of "Instructions for shift crew"
(Created page with "1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady Check the deadtime and the scaler in the 50k report file which is on: /home/cdaq...") |
|||
Line 1: | Line 1: | ||
− | + | === Scaler rates === | |
+ | |||
+ | Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady | ||
Check the deadtime and the scaler in the 50k report file which is on: | Check the deadtime and the scaler in the 50k report file which is on: | ||
Line 5: | Line 7: | ||
/home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/ | /home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/ | ||
− | + | === Hall C VCS replay directory === | |
+ | |||
+ | Login to cdaql1 machine and go to hallc_replay directory if you are not there already: | ||
> ssh cdaql1 | > ssh cdaql1 | ||
Line 13: | Line 17: | ||
go_analysis will bring you to the vcs2019 directory. | go_analysis will bring you to the vcs2019 directory. | ||
− | + | === Monitoring === | |
+ | |||
+ | Run standard HMS and SHMS coincidence replay after 50000 trigger and once after the run is done. Run: | ||
> ./run_coin_hms.sh | > ./run_coin_hms.sh | ||
Line 22: | Line 28: | ||
- Check all the figures and compare them to the reference. If anything seems wrong, try to fix it, ask an expert if needed and make a log entry. | - Check all the figures and compare them to the reference. If anything seems wrong, try to fix it, ask an expert if needed and make a log entry. | ||
+ | |||
To replay a previous run or replay only with a limited number of events, do: | To replay a previous run or replay only with a limited number of events, do: | ||
Line 31: | Line 38: | ||
Give a number of events or "-1" for a full run replay. | Give a number of events or "-1" for a full run replay. | ||
− | + | === Run sheet === | |
+ | |||
+ | Fill the run sheet for each run, including junk | ||
+ | |||
+ | The run sheet has to be filled by the SL or TO |
Revision as of 10:42, 15 July 2019
Scaler rates
Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady
Check the deadtime and the scaler in the 50k report file which is on:
/home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/
Hall C VCS replay directory
Login to cdaql1 machine and go to hallc_replay directory if you are not there already:
> ssh cdaql1
> go_analysis
go_analysis will bring you to the vcs2019 directory.
Monitoring
Run standard HMS and SHMS coincidence replay after 50000 trigger and once after the run is done. Run:
> ./run_coin_hms.sh
> ./run_coin_shms.sh
It replays the most recent run and monitoring plots will automaticaly open. It will take the number of events that have been already accumulated.
- Check all the figures and compare them to the reference. If anything seems wrong, try to fix it, ask an expert if needed and make a log entry.
To replay a previous run or replay only with a limited number of events, do:
./run_coin_hms.sh <run_number> <number_of_event>
./run_coin_shms.sh <run_number> <number_of_event>
Give a number of events or "-1" for a full run replay.
Run sheet
Fill the run sheet for each run, including junk
The run sheet has to be filled by the SL or TO