Difference between revisions of "RC Meeting and Run Plan, Mon, January 27th 2020"

From HallCWiki
Jump to: navigation, search
(Other)
 
Line 77: Line 77:
 
=== Other ===
 
=== Other ===
 
* Replace target cell in ~1 week
 
* Replace target cell in ~1 week
* In the event that the SHMS dipole trips again, take a screenshot of the PSU window '''before''' resetting the interlock and post it to hclog.
 
  
 
= Special Requests =
 
= Special Requests =
Line 88: Line 87:
 
** HMS Q1 must be ramped down in 50A steps in all cases
 
** HMS Q1 must be ramped down in 50A steps in all cases
 
** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
 
** Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
 +
** If SHMS dipole trips again, take a screenshot of the PSU window '''before''' resetting the interlock and post it to hclog.
 
* Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
 
* Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
 
* The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
 
* The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.

Latest revision as of 09:37, 28 January 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

General updates

Weekend

  • Saturday: solid data (after 2AM SHMS dipole trip)
  • Sunday: SHMS Q3 tripped
    • Might be mass flow controller, which would be a "quick" fix.
    • Worst case scenario could be a blockage that requires warming the magnets up.

Monday

  • Moller during day shift

Recent polarization measurements

Didn't have time to compile this today :(

Beam checkout

Current Run Plan

  • Always take 120Hz of EDTM

Monday swing – Tuesday day

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!                                                     !!
!!  All NMR measurement HCLOG entries should include:  !!
!!     1) A title that clearly lists polarization      !!
!!     2) Screenshots of both NMR_FieldSweep and       !!
!!        the polarization fit.                        !!
!!                                                     !!
!!  For an example see the following entry:            !!
!!     https://logbooks.jlab.org/entry/3768696       !!
!!                                                     !!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Future

Moller & spin dance

  • Finally took measurement today! (No spin dance)
  • Moller + spin dance on Tuesday 2/4? Are there beam studies scheduled for 1/28?

Hall Access

  • Thursday morning
    • SHMS Q3
    • EPR fiber bundle, maybe laser alignment
    • SAF112 walkthroughs with Joe at 9AM on Thursday
    • PSU (under pivot) for polhe3 rack camera and hcreboot5 needs to be manually power cycled [1]
      • "hcreboot5 has a number of the target controls on it as well [which?] so we won't be able to power cycle those remotely either until this is done." - Brad

Other

  • Replace target cell in ~1 week

Special Requests

  • Keep target expert schedule filled out on whiteboard

Notices in Effect for Shift Crew

  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Magnet policies
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
    • If SHMS dipole trips again, take a screenshot of the PSU window before resetting the interlock and post it to hclog.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[2]
  • Temporary Laser instructions can be found here [3]


Planned Accelerator Configuration Changes