Difference between revisions of "Pol He-3 Target Screen Setup"
From HallCWiki
Jump to navigationJump to searchLine 58: | Line 58: | ||
~/Desktop/A1nD2n_SlowControl/EPICS Daemon.vi | ~/Desktop/A1nD2n_SlowControl/EPICS Daemon.vi | ||
==== Field Correction ==== | ==== Field Correction ==== | ||
− | * | + | * Some limited documentation/details can be found here: https://logbooks.jlab.org/entry/3786238 |
~/Desktop/A1nD2n_SlowControl/Field_Corection.vi | ~/Desktop/A1nD2n_SlowControl/Field_Corection.vi | ||
Revision as of 13:40, 18 February 2020
Pol He-3 Target Screen Setup
Target Training Slides / Polarimetry How-to
Setup target ladder, stripcharts on HCDESK4
To setup non-LabVIEW screens (stripcharts, target ladder, etc)
- Go to HCDESK4 (dual monitor linux host to the right of the TO station) and open a terminal on an empty workspace
- Run go_target
- Arrange the screens as shown in the snapshot
Setup target laser controls on POLTARCC
Connect to the Laser computer (polhe1)
- Go to POLTARCC (single monitor linux host to the right in the corner of the TO station)
- Open a terminal on an empty workspace
- Run go_lasers'
NOTE: This opens a VNC client connecting to the polhe1 Windows computer in the Laser room. It will go full screen when it starts. Hit the F8 key to exit the VNC screen if necessary.
Run the Laser Control and EPICS binder software
- Double-click on the Raytum D-Light Laser Controller, Multiple Station icon in the top-middle of the screen.
- On the Sidebar that appears Double-click on the D-Light Laser Controller, Multiple Station.vi line (highlighted here)
- Click on the white arrow near the top of the window that pops up to run the
program. The system will search for the lasers -- be patient, it can take
30-60 seconds until the desired lasers show 'OK'. Click Accept and the
main laser panel will appear with all accessible lasers.
- On the same Sidebar, expand EPICS.lvlib and double-click on Adapter.vi.
- Click on the white 'run' arrow at the top of the window. This binds the LabVIEW variables to an EPICS IOC for monitoring and logging.
- Minimize (do not close) all windows except for the D-Light Laser Controller window.
- Your screen should look similar to the snapshot.
Longitudinal Rotation Stage Control
LabVIEW software notes
- Based on summary from https://logbooks.jlab.org/entry/3782172
Convection Heater
~/Desktop/A1nD2n_SlowControl/Convection_Heater.vi
Current Meter Monitor
~/Desktop/A1nD2n_SlowControl/Current Meter Monitor.vi
EPICS Daemon
~/Desktop/A1nD2n_SlowControl/EPICS Daemon.vi
Field Correction
- Some limited documentation/details can be found here: https://logbooks.jlab.org/entry/3786238
~/Desktop/A1nD2n_SlowControl/Field_Corection.vi
Field Rotation
~/Desktop/A1nD2n_SlowControl/Field_Rotation_v5_A1nD2n_LAg_SKe.vi NOTE: (Do not use Field_Rotation_v5.vi since we replaced power supply. LAg = Large Coil Agillent; SKe = Small Coil Kepco)
Laser Spectrum
~/Desktop/A1nD2n_SlowControl/Laser Spectrum Monitor.vi
NMR Field Sweep
~/Desktop/A1nD2n_SlowControl/NMR_FieldSweep_v15_A1nD2n_LAg_SKe.vi (same reason as Field Rotation above)
Target Status
~/Desktop/A1nD2n_SlowControl/System_Status.vi
Polarization Calculation
~/Desktop/A1nD2n_SlowControl/Polarization.vi
EPR software
- EPR-RM sweep: EPR_FM_PIBOX_0_A1n_D2n.vi
- EPR-AFP: EPR_AFP_Modified_v3_A1n_D2n.vi
EPICS bindings
- Laser bindings (polhe1)
- Polarimetry bindings (polhe4)