Difference between revisions of "Target Field and Kepco Info"

From HallCWiki
Jump to navigationJump to search
m (Wmhenry moved page Kepco to Target Field and Kepco Info)
Line 20: Line 20:
 
==Field Measurements==
 
==Field Measurements==
  
==Plan for returning from CODIV shutdown==
+
==Plan for returning from COVID shutdown==
 
** Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
 
** Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
 
** Measure resistance to ground for both coils
 
** Measure resistance to ground for both coils

Revision as of 09:39, 1 June 2020

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

Labview Program Guide

Field Measurements

Plan for returning from COVID shutdown

    • Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
    • Measure resistance to ground for both coils
    • Install latest new power supply, add additional circuitry
    • Test power supplies in both current and voltage control mode
    • Look at PS output on scope, with and without RF on.
    • Test NMR in both voltage and current mode
    • Ensure Labview is ready to go for either configuration