Difference between revisions of "Simona's parting notes"

From HallCWiki
Jump to navigationJump to search
(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room </b> <b> Wed. Aug 5 2020. </b> * No beam to Hall C since the storm dow...")
 
 
Line 20: Line 20:
 
== Recent polarization measurements ==
 
== Recent polarization measurements ==
  
* Target polarization looks great:  
+
* Target polarization looks great: https://logbooks.jlab.org/entry/3820866
  
 
= Current Run Plan =
 
= Current Run Plan =

Latest revision as of 15:08, 5 August 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room

Wed. Aug 5 2020.

  • No beam to Hall C since the storm down
  • Our counting house was staffed on the promise of getting beam; we've seen not even one squirt since Aug. 4th 1 am!
  • Here is a link to my RC report for the 1:30 meeting which clearly shows that Hall C is not given the priority it needs
  • After discussions between RC and spokespeople and then spokespeople and the Hall leader and then Hall leader and PD the plan is for Ops to finish up 1 pass beam delivery to B (2 shifts), do the pass change for B (and A), establish the 5 pass machine by delivering beam to Hall C - 30 muA stable and to B and D ans then bring A on line.

General updates

  • On the hall side all looks good


Pending problem

  • No beam

Recent polarization measurements

Current Run Plan

Normal Production running

  • Prerequisites
    • Make sure the raster size is correct (4-4.5)
    • Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
    • Running on cell targets: raster always ON (4-4.5, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
    • Always take 120Hz of EDTM
    • Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
    • Change the IHWP every 4 hours when running on glass cells
  • Run plan
    • Harp scans with 3H07 A and B
    • If profile looks good, production on 3He


Notes for tomorrow's 7:45 meeting

  • C has priority over A per Thia's e-mail
  • C needs 30 muA now

Future

  • After ~ 10 days of running Hall C will go to 1 pass for ~3 days

Hall Access

  • Tuesday is maintenance day on the Ops side; perfect time for me and the techs to remove the SoLID Cher detector package from between the HMS and beamline

When there is a down:

  • If the down is 2+ hours call Simona: she will check with the RC to see if there is an opportunity for work in the Hall (SoLID Cherenkov parasitic test)

Notices in Effect for Shift Crew

  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Magnet policies
    • Spectrometer GUI (go_magnets) should always be visible on Shift Leader computer, hcdesk3
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
    • If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera before resetting the interlock and post it to hclog.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[1]

Planned Accelerator Configuration Changes

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links