Difference between revisions of "D2n Run Plan 2020"
From HallCWiki
Jump to navigationJump to searchLine 28: | Line 28: | ||
* [https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-POL3HE Hall C Shift Schedule] | * [https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLC-POL3HE Hall C Shift Schedule] | ||
− | = | + | = Data Collection Status = |
+ | |||
+ | *; Data collection status is best monitored using <code>d2n_status_table</code> on cdaq@cdaql1: | ||
+ | [cdaq@cdaql1 ~]$ go_analysis pro | ||
+ | cdaq@cdaql1:~/polhe3/production/hallc_replay$ d2n_status_table | ||
+ | |||
+ | * That table is also posted to the [https://logbooks.jlab.org/book/hclog HCLog] every shift with the subject "Recent SHMS and HMS run list". | ||
+ | ** You can use the <code>Hall C Run List Summaries</code> link under the ''Useful Links'' sidebar on the right as a shortcut. |
Revision as of 22:05, 15 August 2020
Rough / High-level sketch of d2n kinematic settings
Reduced kinematics list to accommodate limited beam time (dropped 1/4 of kinematics)
--------- Beam Params ---------- E_beam = 10.4 GeV/c I_beam = 30 uA P_targ = 0.50 P_beam = 0.80
--------- HMS ---------- E' theta x Q2 W *C -4.0 20.0 0.418 5.018 2.806 [Starting here] -- Only setting compatible with SOLID Cherenkov small-angle test. A -4.2 13.5 0.207 2.414 3.178 B -4.2 16.4 0.305 3.554 2.993
--------- SHMS ---------- E' theta x Q2 W *X -7.5 11.0 0.527 2.866 1.859 [Starting here] Y -6.4 14.5 0.565 4.240 2.036 Z -5.6 18.0 0.633 5.701 2.046
Run / Shift Schedule
- We started taking on Swing on Aug 7 (took a few days for beam to stabilize)
- Beam is scheduled to turn off 8am, Sept 21 (roughly 6 weeks) [1]
- Hall C Shift Schedule
Data Collection Status
- Data collection status is best monitored using
d2n_status_table
on cdaq@cdaql1
- Data collection status is best monitored using
[cdaq@cdaql1 ~]$ go_analysis pro cdaq@cdaql1:~/polhe3/production/hallc_replay$ d2n_status_table
- That table is also posted to the HCLog every shift with the subject "Recent SHMS and HMS run list".
- You can use the
Hall C Run List Summaries
link under the Useful Links sidebar on the right as a shortcut.
- You can use the