= Hall C Status = | = Hall C Status = | ||
# Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.) | # Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.) | ||
+ | |||
# On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit. | # On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit. | ||
+ | |||
# End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. (NOTE TO SELF: ARE THEIR INSTRUCTIONS FOR THIS ON THE WIKI? IT WOULD NEVER OCCUR TO ME TO CLICK ON THE HEARTBEAT.) | # End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. (NOTE TO SELF: ARE THEIR INSTRUCTIONS FOR THIS ON THE WIKI? IT WOULD NEVER OCCUR TO ME TO CLICK ON THE HEARTBEAT.) | ||
+ | |||
# Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750 https://logbooks.jlab.org/entry/3932747 | # Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750 https://logbooks.jlab.org/entry/3932747 | ||
+ | |||
# Number of good pions is ????. | # Number of good pions is ????. | ||
Revision as of 09:23, 27 October 2021
RC Meeting Information
RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920
Accelerator Status
- Beam delivery back to Halls B,C,D on owl shift.
Hall C Status
- Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)
- On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit.
- End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. (NOTE TO SELF: ARE THEIR INSTRUCTIONS FOR THIS ON THE WIKI? IT WOULD NEVER OCCUR TO ME TO CLICK ON THE HEARTBEAT.)
- Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750 https://logbooks.jlab.org/entry/3932747
- Number of good pions is ????.
Current Run Plan
- Day shift only: Try to take 1 hour of Dummy target each day. (a 100% live hour)
- Tentatively scheduled: a BCM calibration on Wednesday mid-afternoon.
- Continue data taking until early Nov
Current Issues
- Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
- HMS Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping: https://logbooks.jlab.org/entry/3932992 .
- Serious HB LHe low liquid level alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
- Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
- Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
- HCCAM02 not functioning (lift required to replace).