Difference between revisions of "Hall C Target Ladder"

From HallCWiki
Jump to navigationJump to search
Line 2: Line 2:
 
where cryotargets Loop 1 (d, deuterium) and Loop 2 (H, hydrogen)
 
where cryotargets Loop 1 (d, deuterium) and Loop 2 (H, hydrogen)
  
As of Nov 22, 2021, the Hall C Target Ladder has the following targets ([https://logbooks.jlab.org/entry/3948018]):  
+
As of Nov 22, 2021, the Hall C Target Ladder has the following targets [https://logbooks.jlab.org/entry/3948018]:  
  
 
[[File:Hc_ladder_Nov21_2021.png | 400 px]]
 
[[File:Hc_ladder_Nov21_2021.png | 400 px]]

Revision as of 09:29, 22 November 2021

The CaFe PAC45 targets proposed were: d, 4He, 9Be, 10B, 11B, 12C, 28Si, 40Ar, 40Ca, 48Ca, 48Ti and 54Fe (and H for hydrogen elastics check) where cryotargets Loop 1 (d, deuterium) and Loop 2 (H, hydrogen)

As of Nov 22, 2021, the Hall C Target Ladder has the following targets [1]:

Hc ladder Nov21 2021.png