Line 16: Line 16:
 
* Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be:  ABU_prorated = 15/(max current limit) * ABU                                                                                                                                                                       
 
* Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be:  ABU_prorated = 15/(max current limit) * ABU                                                                                                                                                                       
 
* Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting                             
 
* Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting                             
* When analyzing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analyzing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.                                                                                                                                                                                              
+
* When analyzing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analyzing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.
                                                                                                                                                                                                         
+
*Keep on eye on HMS DC chamber wire maps.
 +
 
 
= Current Issues =                                                                                                                                                                                         
 
= Current Issues =                                                                                                                                                                                         
 
* shift crew continues to see HMS DC noise outbursts more frequently, see log-entries:                                                                                                                     
 
* shift crew continues to see HMS DC noise outbursts more frequently, see log-entries:                                                                                                                     

Revision as of 09:56, 25 June 2022

Current Status

  • Accelerator status:
    • Can't deliver more than 20 uA, probably stuck here till Monday
  • Experiment status:
    • pionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency
    • On page 33 of run plan. New Setting: Q2=2.45, W=3.20, x=0.21, high ε data taking. 12,000 of 30,000 pions completed at this setting.
    • LD2-> Dummy -> LH2 -> SHMS Angle change

Current Run Plan

pionLT Summer 2022 Run Plan

Physics Status

Notices in Effect for Shift Crew

  • Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU
  • Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting
  • When analyzing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analyzing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.
  • Keep on eye on HMS DC chamber wire maps.

Current Issues

Planned Accesses to the Hall

    • Need new plan to address HMS DC noise. Replace cards with spares?

Planned Accelerator Configuration Changes

Special Requests

  • Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. ( DONE )