Difference between revisions of "December 7, 2022"
From HallCWiki
Jump to navigationJump to searchLine 32: | Line 32: | ||
* HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300 | * HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300 | ||
* Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562 | * Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562 | ||
+ | ** Likely a leak in the Helium-3 cell | ||
* Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV) | * Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV) | ||
− | ** Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am. | + | ** Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am. |
= Run Plan = | = Run Plan = |
Revision as of 10:43, 7 December 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Currently in Controlled Access during the RF recovery
- HMS Q1 power supply. Ellen replace the signal conditioner: ttps://logbooks.jlab.org/entry/4097300
- Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562
- Likely a leak in the Helium-3 cell
- Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV)
- Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am.
Run Plan
Target Boiling- BCM Calibration?
- Energy Measurement?