RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- All shifts have been filled! Thanks Hakob!!!
- Shift Summaries
- Day (12/14)
- Swing (12/14)
- Owl (12/15)
- TODAY (12/15)
- Finished CSB data collection during OWL.
- Beginning Large Angle, Large Momentum HMS electron settings.
- BCM calibration began 9:15
- YESTERDAY (12/14) oh boy...
- Attempted Beam Energy Measurement during the morning. Did NOT go well.
- The transport tunnel and the hall was filled with radiation, which caused several issues. CARM strip chart comparison
- About 7x higher than the measurement taken June 12. Prevented controlled access.
- At 11:40 AM, heater power and fan powered went to zero. Experts called in.
- Eventually discovered by Chris Keith and Dave Meekins that the UPS power strip had died (due to radiation).
- ODH alarms in the transport tunnel and the west wall went off, preventing controlled access. OM4, OM3, both now bypassed. Later discovered to have been ODH HIGH alarms (failure due to radiation).
- Cryo group was concerned that there was a leak with all the chaos. Cryo was turned off to the targets. False alarm. Cryo returned to the target around 3:30 PM.
- Targets quickly cooled back down and made a full recovery. No He3 or He4 loss expected.
- Began to bring back the hall to beam permit at 3:30 PM. Tune beam delivered at 5:30 PM. Smooth running since.
- CSB kinematics finished.
- Attempted Beam Energy Measurement during the morning. Did NOT go well.
Current Run Plan
- Continue following run plan with Large Angle HMS data at electron polarity.
Notices in Effect for Shift Crew
Current Issues
- SHMS pre shower HV channels keep failing. Dave has moved 2 channels around so far.
- HMS Q2 alarm handler doesn't register positron polarity and the limits have to be changed manually.