Difference between revisions of "December 16, 2022"

From HallCWiki
Jump to: navigation, search
Line 35: Line 35:
 
* Today (12/16)
 
* Today (12/16)
 
** Currently in the second cycle of Setting 1 of HMS high x at 35 degrees.  
 
** Currently in the second cycle of Setting 1 of HMS high x at 35 degrees.  
** BCM calibration later in the day if the unser offset issue gets fixed.  
+
** BCM calibration after this meeting if the unser offset is still behaving.  
 
* Yesterday (12/15)
 
* Yesterday (12/15)
 
** BCM calibrations did not work, as the unser was saturated due to a large offset.
 
** BCM calibrations did not work, as the unser was saturated due to a large offset.
 
*** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it].  
 
*** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it].  
*** [https://logbooks.jlab.org/entry/4102427 But it is misbehaving again this morning. Dave Mack has been emailed].
+
*** [https://logbooks.jlab.org/entry/4102427 But it is misbehaving again this morning]. Dave G cycled it and it should be okay now.  
 
*** Could the radiation from the Beam Energy Measurement mishap killed the unser UPS in the hall?   
 
*** Could the radiation from the Beam Energy Measurement mishap killed the unser UPS in the hall?   
 
** [https://logbooks.jlab.org/entry/4102214 PSS Failure: Hall C suddenly dropped to Restricted Access around 4pm].
 
** [https://logbooks.jlab.org/entry/4102214 PSS Failure: Hall C suddenly dropped to Restricted Access around 4pm].
Line 48: Line 48:
  
 
= Current Run Plan =
 
= Current Run Plan =
* BCM Calibration planned for 9:30 AM Dec 16 (this morning)
+
* BCM Calibration after this RC meeting
 
* Continue with run plan printed sheet. High x HMS at 35 degrees.  
 
* Continue with run plan printed sheet. High x HMS at 35 degrees.  
  
Line 57: Line 57:
 
= Current Issues =
 
= Current Issues =
 
* HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field. Although it might make chaining to the next HMS momentum difficult.   
 
* HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field. Although it might make chaining to the next HMS momentum difficult.   
* Unser offset still not behaving correctly. Can't do BCM calibration until that is fixed. Dave Mack has been emailed about it.  
+
* Unser offset issues may still be persisting. Dave Mack has been emailed about it.  
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =

Revision as of 11:03, 16 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status


Current Run Plan

  • BCM Calibration after this RC meeting
  • Continue with run plan printed sheet. High x HMS at 35 degrees.

Notices in Effect for Shift Crew

  • Continue to fill out SHMS excel sheet for good electrons .
  • Keep SHMS prescaled rate below 8kHz.

Current Issues

  • HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field. Although it might make chaining to the next HMS momentum difficult.
  • Unser offset issues may still be persisting. Dave Mack has been emailed about it.

Planned Accesses to the Hall

  • May need to replace unser UPS in the hall. Waiting to hear back from Dave Mack on what he thinks.

Planned Accelerator Configuration Changes

Special Requests