Difference between revisions of "December 19, 2022"

From HallCWiki
Jump to: navigation, search
Line 33: Line 33:
 
** [https://logbooks.jlab.org/entry/4103094 Swing 12/18]
 
** [https://logbooks.jlab.org/entry/4103094 Swing 12/18]
 
** [https://logbooks.jlab.org/entry/4103227 Owl 12/19]
 
** [https://logbooks.jlab.org/entry/4103227 Owl 12/19]
* Today  
+
 
 +
* Today (12/19)
 +
** Beam taken away at 7am as scheduled.
 
** Hall C in Controlled Access.  
 
** Hall C in Controlled Access.  
 
** Beginning of the scheduled accelerator down.  
 
** Beginning of the scheduled accelerator down.  
 
** SHMS and HMS magnets ramped to zero.  
 
** SHMS and HMS magnets ramped to zero.  
** Experts to warm up the target.
+
** SHMS and HMS TVs are off.
 +
** Dave Meekins arrived at 8:30AM to begin warming up the target.
 +
 
 +
*Yesterday (12/18)
 +
** Shortly after (12/18) Owl shift started, there was another PSS failure and Hall C suddenly dropped to restricted access.
 +
*** The tech on-call wasn't able to restore the system.
 +
*** The expert arrived at 8AM and made hardware replacements.
 +
*** Hall C back to beam permit at 12:30 AM.
 +
*** [https://logbooks.jlab.org/entry/4103028 All hardware related to communication interface in the hall has been replaced. Radiation damage is the suspect.]
 +
** Smooth running on Setting 2 of high x HMS 35 degrees until beam was taken away at 7am as scheduled.
 +
** A bit more than half of Setting 2 is complete.
 +
 
 +
 
  
 
= Current Run Plan =
 
= Current Run Plan =
*
+
* Is there any work that needs to be coordinated by RC today?
 +
* No Hall C meeting today?
 +
* Scan run sheets?
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
Line 46: Line 62:
  
 
= Current Issues =
 
= Current Issues =
*
+
* Beam Energy Measurement
 +
** I was assured at the 8:00AM meeting today that they are taking the incident seriously and are still investigating.
 +
** Doug mentioned that they are considering reporting it as an "incident" to the DOE in part due to all the equipment damage.
 +
* Unser
 +
** Front end electronics suspected to be damaged from the radiation from the beam energy measurement.
 +
*** (Might be a good idea to find some evidence of this with the scalers).
 +
** [https://logbooks.jlab.org/entry/4103102 Dave Mack is thinking about it and will work on it before we come back in January].
 +
* Radiation Damage in general.
 +
** We should be on the lookout for other hardware that may have been damaged by radiation.
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
Line 55: Line 79:
  
 
= Special Requests =
 
= Special Requests =
*
+
* Happy Holidays!!!

Revision as of 10:16, 19 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Today (12/19)
    • Beam taken away at 7am as scheduled.
    • Hall C in Controlled Access.
    • Beginning of the scheduled accelerator down.
    • SHMS and HMS magnets ramped to zero.
    • SHMS and HMS TVs are off.
    • Dave Meekins arrived at 8:30AM to begin warming up the target.


Current Run Plan

  • Is there any work that needs to be coordinated by RC today?
  • No Hall C meeting today?
  • Scan run sheets?

Notices in Effect for Shift Crew

Current Issues

  • Beam Energy Measurement
    • I was assured at the 8:00AM meeting today that they are taking the incident seriously and are still investigating.
    • Doug mentioned that they are considering reporting it as an "incident" to the DOE in part due to all the equipment damage.
  • Unser
  • Radiation Damage in general.
    • We should be on the lookout for other hardware that may have been damaged by radiation.

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests

  • Happy Holidays!!!