We smoothly took elastic data during '''Sunday Swing and Monday Owl''' (https://logbooks.jlab.org/entry/4190661 and https://logbooks.jlab.org/entry/4190802). Beam was good and stable overnight.
 
We smoothly took elastic data during '''Sunday Swing and Monday Owl''' (https://logbooks.jlab.org/entry/4190661 and https://logbooks.jlab.org/entry/4190802). Beam was good and stable overnight.
  
We took the beam until 8:15am and then requested the hall survey for Controlled access. Today we are moving the NPS calorimeter closer to the target in order to start actual production data. The work in the hall will take several hours.
+
We took the beam until 8:15am and then requested the hall survey for Controlled access. Today we are moving the NPS calorimeter closer to the target in order to start taking actual production data. The work in the hall will take several hours.
  
 
We will have an RC meeting today at 11 a.m.
 
We will have an RC meeting today at 11 a.m.

Revision as of 07:48, 2 October 2023

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Zoom remote connection information:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953

Useful Links

Summary

During Sunday (10/02) Day shift we took optics data in KinC-x50-2 kinematics: sieve, large collimator, sweep magnet on and off (https://logbooks.jlab.org/entry/4190352). By the end of the shift we were done with optics runs and then did the configuration change back to elastic setting.

We smoothly took elastic data during Sunday Swing and Monday Owl (https://logbooks.jlab.org/entry/4190661 and https://logbooks.jlab.org/entry/4190802). Beam was good and stable overnight.

We took the beam until 8:15am and then requested the hall survey for Controlled access. Today we are moving the NPS calorimeter closer to the target in order to start taking actual production data. The work in the hall will take several hours.

We will have an RC meeting today at 11 a.m.


Planned Accesses to the Hall

Hall will be in Controlled access for the Day shift today. We are moving the NPS closer to the target.