* Moller measurement starting 8:30 a.m., last Friday for the day shift.
 
* Moller measurement starting 8:30 a.m., last Friday for the day shift.
  
= Current Issues =
+
= Issues =
 
* Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099
 
* Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099
 
* NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048
 
* NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048

Latest revision as of 09:51, 26 October 2023

= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Past 24 hours

Items addressed from our side inside of the Hall:

  • Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked?
  • Jerry and others worked on the pump on top of the HMS
  • Ellen went into the hall to check various cryocomponents.
  • AC work in the CH completed

Items addressed from our side of the Hall:

  • Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current.
  • Bob worked on the scaler.
  • Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.)
  • Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes".

Current Status

Current Run Plan

  • Half wave plane change at 11 a.m.
  • Moller measurement starting 8:30 a.m., last Friday for the day shift.

Issues

Planned Accesses to the Hall Today

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 31th