Difference between revisions of "October 29, 2023"

From HallCWiki
Jump to navigationJump to search
Line 61: Line 61:
 
* Half wave plane change at 11 a.m.
 
* Half wave plane change at 11 a.m.
 
* Moller measurement starting 8:30 a.m., last Friday for the day shift.
 
* Moller measurement starting 8:30 a.m., last Friday for the day shift.
 
= A few new/raised concerns: =
 
* During the DAQ Coda configuration changes, the instruction is very unclear if a "RESET" procedure is needed. We need to make the wiki instructions clear on this part. Because of this ambiguity, we potentially might have lost 1 good run on this.
 
* Part of the run plan requires changing settings, and beam current, frequently, as a result, the run sheets are not completely filled.
 
* DAQ crashes during the run-ending process, in this case, the Run End log is not generated. It is not clear how to keep records for such runs
 
  
 
=Special Studies=
 
=Special Studies=

Revision as of 14:10, 29 October 2023

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success
 Meeting ID: 161 701 5555
 Passcode: 
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Past 24 hours

Since the last update, we have been in the production phase. However, there were a few issues and downtime:

  • SHMS Helium level reading glitch.
  • NPS Chiller coolant and crystal zone back temperature sensor over the limit.

The spokespersons jointly made decisions to take action to eliminate the above issues in future runnings.

Current Status

  • Production with the newly reduced two-photon threshold.

Current Run Plan

  1. . We will likely postpone the Monday corrector coil beam steering test, to the next setting change, since the current setting doesn't require the corrector coil.
  1. . Wednesday, November 2, 7:30 a.m.: sweep the hall open for maintenance first thing in the morning.

We will attempt the following maintenance items:

    1. . NPS students remove/replace damaged PMT/base.
    2. . NPS shielding installation if ready
    3. . Ellen and Heidi for Cryo component check?
    4. . Chandan (and Dave Mac) checking/maintaining HMS hodoscope. to address this issue: https://logbooks.jlab.org/entry/4210267
  1. . Do the DAQ experts need to do something?

I am sure the maintenance list will grow as we get closer to Wednesday.

  1. . Tuesday, November 3, 11:00 a.m.:

We will invite Vald to give an insight into the high radiation test results.

There will be a meeting tomorrow to discuss a few remaining questions and decisions:

  1. . Adjust the triggers/running condition at the current setting.
  2. . Final decision on Monday corrector coil steering study.
  3. . Maintenance day planning.
  4. . Potential report from Vlad on the radiation damage study.
  • Continue production
  • Half wave plane change at 11 a.m.
  • Moller measurement starting 8:30 a.m., last Friday for the day shift.

Special Studies

Sweeper off test results:

Planned Accesses to the Hall Today

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 31st

Special Requests