Difference between revisions of "October 29, 2023"

From HallCWiki
Jump to navigationJump to search
Line 31: Line 31:
 
* SHMS Helium level reading glitch.
 
* SHMS Helium level reading glitch.
 
* NPS Chiller coolant and crystal zone back temperature sensor over the limit.
 
* NPS Chiller coolant and crystal zone back temperature sensor over the limit.
 +
* A new trigger threshold is introduced based on Alex's suggestion.
  
 
The spokespersons jointly made decisions to take action to eliminate the above issues in future runnings.
 
The spokespersons jointly made decisions to take action to eliminate the above issues in future runnings.

Revision as of 14:11, 29 October 2023

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success
 Meeting ID: 161 701 5555
 Passcode: 
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Past 24 hours

Since the last update, we have been in the production phase. However, there were a few issues and downtime:

  • SHMS Helium level reading glitch.
  • NPS Chiller coolant and crystal zone back temperature sensor over the limit.
  • A new trigger threshold is introduced based on Alex's suggestion.

The spokespersons jointly made decisions to take action to eliminate the above issues in future runnings.

Current Status

  • Production with the newly reduced two-photon threshold.

Current Run Plan

  1. . We will likely postpone the Monday corrector coil beam steering test, to the next setting change, since the current setting doesn't require the corrector coil.
  1. . Wednesday, November 2, 7:30 a.m.: sweep the hall open for maintenance first thing in the morning.

We will attempt the following maintenance items:

    1. . NPS students remove/replace damaged PMT/base.
    2. . NPS shielding installation if ready
    3. . Ellen and Heidi for Cryo component check?
    4. . Chandan (and Dave Mac) checking/maintaining HMS hodoscope. to address this issue: https://logbooks.jlab.org/entry/4210267
  1. . Do the DAQ experts need to do something?

I am sure the maintenance list will grow as we get closer to Wednesday.

  1. . Tuesday, November 3, 11:00 a.m.:

We will invite Vald to give an insight into the high radiation test results.

There will be a meeting tomorrow to discuss a few remaining questions and decisions:

  1. . Adjust the triggers/running condition at the current setting.
  2. . Final decision on Monday corrector coil steering study.
  3. . Maintenance day planning.
  4. . Potential report from Vlad on the radiation damage study.
  • Continue production
  • Half wave plane change at 11 a.m.
  • Moller measurement starting 8:30 a.m., last Friday for the day shift.

Special Studies

Sweeper off test results:

Planned Accesses to the Hall Today

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 31st

Special Requests