(Created page with "[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the previous page] <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-hou...")
 
Line 39: Line 39:
 
= Near Future Plan =  
 
= Near Future Plan =  
 
# We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
 
# We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
# Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m, and sweep close the hall at 16:00.  
+
# Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m., and sweep close when the NPS maintenance work is completed (no time limit).  
 
We will attempt the following maintenance items:
 
We will attempt the following maintenance items:
## NPS students will remove all PMTs + bases from column. Hall tech support is needed for this part.
+
## Put the SHMS to the largest angle possible. Full hall sweep.
 +
## NPS students will remove all PMTs + bases. Hall tech support is needed for this part.
 
## Two new bases with the low voltage regulator bypassed (verified) with be swapped into the NPS.
 
## Two new bases with the low voltage regulator bypassed (verified) with be swapped into the NPS.
## NPS shielding installation if ready
+
## NPS shielding installation: large sheets of borated-polyethylene
 
## Heidi is looking into adding an additional bandit to ensure SHMS dipole stability.
 
## Heidi is looking into adding an additional bandit to ensure SHMS dipole stability.
 
## Chandan and Dave Mac will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
 
## Chandan and Dave Mac will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
 
## Aaron will push new code for the NPS chiller controller.
 
## Aaron will push new code for the NPS chiller controller.
# Wednesday, Nov 1, 11:00 a.m.: We will invite Vald to give an insight into the high radiation test results.  
+
## Joe will guide a walk-through at 1 p.m.  
 +
# Sometime in the future, we will invite Vald to give an insight into the high radiation test results.  
 
I am sure the maintenance list will grow as we get closer to Wednesday.
 
I am sure the maintenance list will grow as we get closer to Wednesday.
  

Revision as of 16:57, 30 October 2023

Back to the previous page

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success
 Meeting ID: 161 701 5555
 Passcode: 
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Past 24 hours

RC Summary

Current Status

Near Future Plan

  1. We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
  2. Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m., and sweep close when the NPS maintenance work is completed (no time limit).

We will attempt the following maintenance items:

    1. Put the SHMS to the largest angle possible. Full hall sweep.
    2. NPS students will remove all PMTs + bases. Hall tech support is needed for this part.
    3. Two new bases with the low voltage regulator bypassed (verified) with be swapped into the NPS.
    4. NPS shielding installation: large sheets of borated-polyethylene
    5. Heidi is looking into adding an additional bandit to ensure SHMS dipole stability.
    6. Chandan and Dave Mac will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
    7. Aaron will push new code for the NPS chiller controller.
    8. Joe will guide a walk-through at 1 p.m.
  1. Sometime in the future, we will invite Vald to give an insight into the high radiation test results.

I am sure the maintenance list will grow as we get closer to Wednesday.

Special Studies

Planned Accesses to the Hall Today

Planned Accelerator Configuration Changes

  • Pass change in Hall A on the 31st

Special Requests