Difference between revisions of "October 31, 2023"
From HallCWiki
Jump to navigationJump to searchLine 40: | Line 40: | ||
# We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field. | # We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field. | ||
# Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m., and sweep close when the NPS maintenance work is completed (no time limit). | # Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m., and sweep close when the NPS maintenance work is completed (no time limit). | ||
− | We will attempt the following maintenance items: | + | |
− | + | *We will attempt the following maintenance items: | |
− | + | ** Put the SHMS to the largest angle possible. Full hall sweep. | |
− | + | ** NPS students will remove all PMTs + bases. Hall tech support is needed for this part. | |
− | + | ** Two new bases with the low voltage regulator bypassed (verified) with be swapped into the NPS. | |
− | + | ** NPS shielding installation: large sheets of borated-polyethylene | |
− | + | ** Heidi is looking into adding an additional bandit to ensure SHMS dipole stability. | |
− | + | ** Chandan and Dave Mac will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267 | |
− | + | ** Aaron will push new code for the NPS chiller controller. | |
− | + | ** Joe will guide a walk-through at 1 p.m. | |
+ | * Sometime in the future, we will invite Vald to give an insight into the high radiation test results. | ||
I am sure the maintenance list will grow as we get closer to Wednesday. | I am sure the maintenance list will grow as we get closer to Wednesday. | ||
Revision as of 16:58, 30 October 2023
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success Meeting ID: 161 701 5555 Passcode: One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Past 24 hours
RC Summary
Current Status
Near Future Plan
- We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
- Wednesday, November 2, during the beam study, 7:00 beam stops, 7:30 a.m.: sweep the hall open for maintenance; Hall will enter restricted access at 8:00-8:15 a.m., and sweep close when the NPS maintenance work is completed (no time limit).
- We will attempt the following maintenance items:
- Put the SHMS to the largest angle possible. Full hall sweep.
- NPS students will remove all PMTs + bases. Hall tech support is needed for this part.
- Two new bases with the low voltage regulator bypassed (verified) with be swapped into the NPS.
- NPS shielding installation: large sheets of borated-polyethylene
- Heidi is looking into adding an additional bandit to ensure SHMS dipole stability.
- Chandan and Dave Mac will access and check the HMS hodoscope patch panel. to address this issue: https://logbooks.jlab.org/entry/4210267
- Aaron will push new code for the NPS chiller controller.
- Joe will guide a walk-through at 1 p.m.
- Sometime in the future, we will invite Vald to give an insight into the high radiation test results.
I am sure the maintenance list will grow as we get closer to Wednesday.
Special Studies
- Peter found HMS Central Momentum mismatch/Correction: https://logbooks.jlab.org/entry/4210756
Planned Accesses to the Hall Today
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 31st